ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
 |
1700
|
Monday, April 16, 2018, 14:51 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#55 | Spent Target Move | Ta#55 has been moved from the south
hot cell to the spent target vault. It was
30.4mSv/hr upon removal from the hotcell, |
|
1702
|
Thursday, April 19, 2018, 10:27 |
Travis Cave | ITW | Maintenance | | | Entrance module move | The west entrance module has been
moved from the west target station to the
silo. |
|
1706
|
Tuesday, May 01, 2018, 11:12 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#37 | Module move | TM#4 with SiC#37 has been moved from
the East Target Station to the South Hot
cell. |
|
1707
|
Tuesday, May 01, 2018, 13:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#37 | Electrical Check | Electrical check of TM#4 with SiC#37
attached post beam. A short was found between
the Einzel Lens and Chassis. See attached |
|
1708
|
Thursday, May 03, 2018, 08:24 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Electrical Check | The results of yesterdays electrical
check of TM#4 with no target attached. See
the attached PDF for details. |
|
1713
|
Tuesday, May 15, 2018, 07:44 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | no target | Module move | TM#4 was moved to the conditioning
station from the south hot cell. The module
was moved with out the containment box. |
|
1716
|
Thursday, May 17, 2018, 13:17 |
Travis Cave | ITW | Standard Operation | | | Entrance module move | The west entrance module has been
moved from the silo to the west target station. |
|
1719
|
Wednesday, May 23, 2018, 09:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Module move | TM#4 with no target and no containment
box has been moved from the conditioning
station to the south hot cell. |
|
1722
|
Thursday, May 24, 2018, 14:04 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Modules moved | TM#4 has been moved from the south
hot cell to the east target station, and
TM#2 has been moved from the south silo to |
|
1724
|
Friday, May 25, 2018, 11:41 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module move | TM#2 has been moved from the south hot
cell to the conditioning station. |
|
1725
|
Monday, May 28, 2018, 14:06 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#37 | Spent Target Move | SiC#37 has been moved from the South
Hot Cell to the Spent Target Vault. It was
placed in Pail #165 and put in spot 3B of |
|
1730
|
Thursday, June 07, 2018, 11:33 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#22 | Electrical Check | The results of TM#4 with UC#22 electrical
check. See attached PDF. |
|
1731
|
Thursday, June 07, 2018, 11:37 |
Travis Cave | ITE | Standard Operation | TM4 | UC#22 | Module move | TM#4 ,with UC#22, was moved from
the south hot cell to the east target station.
Upon lowering the module down it made contact |
|
1734
|
Friday, June 08, 2018, 14:24 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module move | TM#2 has been moved from the conditioning
station to the south hot cell. |
|
1743
|
Wednesday, June 27, 2018, 14:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module move | TM2 has been moved from the silo
to the south hot cell. |
|
1747
|
Friday, June 29, 2018, 13:36 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Nb#8 | Electrical Check | The results of the various electrical
checks performed on the TM#2 with and without
the Nb#8 target attached. |
  |
1748
|
Tuesday, July 03, 2018, 09:57 |
Travis Cave | ITW | Standard Operation | TM2 | Nb#8 | Module move | TM#2 with Nb#8 has been moved from
the south hot cell to the west target station. |
|
1757
|
Monday, July 23, 2018, 10:31 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#56 | Module move | TM#4 with Ta#56 has been moved from
the conditioning station to the east target
station. |
|
1759
|
Tuesday, July 31, 2018, 10:20 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Nb#8 | Module move | TM#2 with Nb#8 has been moved from
ITW to the south hot cell. |
|
1760
|
Tuesday, July 31, 2018, 11:16 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#22 | Spent Target Move | Yesterday the spent UC#22 target
was moved from the south hot cell to the
spent target vault. It was placed in pail |
|