Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 41 of 141  Not logged in ELOG logo
ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  1695   Friday, March 23, 2018, 09:34 Travis CaveSpent Target VaultStandard Operation ManySpent Target Assay All targets in the ISAC Spent Target
Vault have been either assayed and had field
measurement done on them or just measurement
 Target_Index_2018-03-23.pdf 
  1698   Monday, April 09, 2018, 09:57 Travis CaveSouth Hot-CellStandard OperationTM2Ta#55Module move TM#2 with Ta#55 has been moved from
the west target station to the south hot
cell.
  
  1699   Tuesday, April 10, 2018, 10:43 Travis CaveSouth Hot-CellStandard OperationTM4no targetModule move TM#2 has been moved from the south
hot cell to the south west silo.
  
  1700   Monday, April 16, 2018, 14:51 Travis CaveSpent Target VaultStandard Operation Ta#55Spent Target Move Ta#55 has been moved from the south
hot cell to the spent target vault. It was
30.4mSv/hr upon removal from the hotcell,
  
  1702   Thursday, April 19, 2018, 10:27 Travis CaveITWMaintenance  Entrance module move The west entrance module has been
moved from the west target station to the
silo.
  
  1706   Tuesday, May 01, 2018, 11:12 Travis CaveITEStandard OperationTM4SiC#37Module move TM#4 with SiC#37 has been moved from
the East Target Station to the South Hot
cell.
  
  1707   Tuesday, May 01, 2018, 13:40 Travis CaveSouth Hot-CellStandard OperationTM4SiC#37Electrical Check Electrical check of TM#4 with SiC#37
attached post beam. A short was found between
the Einzel Lens and Chassis. See attached
 TM4_electrical_check_SiC37_post_beam.pdf 
  1708   Thursday, May 03, 2018, 08:24 Travis CaveSouth Hot-CellStandard OperationTM4no targetElectrical Check The results of yesterdays electrical
check of TM#4 with no target attached. See
the attached PDF for details.
 TM4_Electrical_Check_notarget_May_2_2018.pdf 
  1713   Tuesday, May 15, 2018, 07:44 Travis CaveConditioning StationStandard OperationTM4no targetModule move TM#4 was moved to the conditioning
station from the south hot cell. The module
was moved with out the containment box.
  
  1716   Thursday, May 17, 2018, 13:17 Travis CaveITWStandard Operation  Entrance module move The west entrance module has been
moved from the silo to the west target station.
  
  1719   Wednesday, May 23, 2018, 09:48 Travis CaveSouth Hot-CellStandard OperationTM4no targetModule move TM#4 with no target and no containment
box has been moved from the conditioning
station to the south hot cell.
  
  1722   Thursday, May 24, 2018, 14:04 Travis CaveSouth Hot-CellStandard OperationTM4no targetModules moved TM#4 has been moved from the south
hot cell to the east target station, and
TM#2 has been moved from the south silo to
  
  1724   Friday, May 25, 2018, 11:41 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule moveTM#2 has been moved from the south hot
cell to the conditioning station.
  
  1725   Monday, May 28, 2018, 14:06 Travis CaveSpent Target VaultStandard Operation SiC#37Spent Target Move SiC#37 has been moved from the South
Hot Cell to the Spent Target Vault. It was
placed in Pail #165 and put in spot 3B of
 Target_Index_2018-05-28.pdf 
  1730   Thursday, June 07, 2018, 11:33 Travis CaveSouth Hot-CellStandard OperationTM4UC#22Electrical Check The results of TM#4 with UC#22 electrical
check. See attached PDF.
 TM4_UC22_Electrical_Check_South_Hot_Cell.pdf 
  1731   Thursday, June 07, 2018, 11:37 Travis CaveITEStandard OperationTM4UC#22Module move TM#4 ,with UC#22, was moved from
the south hot cell to the east target station.
Upon lowering the module down it made contact
  
  1734   Friday, June 08, 2018, 14:24 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule move TM#2 has been moved from the conditioning
station to the south hot cell.
  
  1743   Wednesday, June 27, 2018, 14:56 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule move TM2 has been moved from the silo
to the south hot cell.
  
  1747   Friday, June 29, 2018, 13:36 Travis CaveSouth Hot-CellStandard OperationTM2Nb#8Electrical Check The results of the various electrical
checks performed on the TM#2 with and without
the Nb#8 target attached.
 TM2_elec_chk_steerers_and_lens_062818.pdfTM2_Nb8_elec_chk_shc.pdfTM2_notgt_elec_chk_shc_062918.pdf 
  1748   Tuesday, July 03, 2018, 09:57 Travis CaveITWStandard OperationTM2Nb#8Module move TM#2 with Nb#8 has been moved from
the south hot cell to the west target station.
  
ELOG V2.9.2-2455