1565
|
Monday, June 26, 2017, 11:42 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#20 | Module move | TM#4 with UC#20 has been moved from
the east target station to the south hot
cell. Also the shield plug was remotely installed |
|
|
1567
|
Tuesday, June 27, 2017, 09:14 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#52 | Module move | TM#4 with Ta#52 has been moved from
south hot cell to the conditioning station. |
|
|
1570
|
Wednesday, June 28, 2017, 09:14 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#52 | Electrical Check | Results of electrical check of TM#4 with
Ta#52 at the south hot cell and the conditioning
station under vacuum. |
|
|
1575
|
Thursday, June 29, 2017, 14:42 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#20 | Spent Target Move | The spent UC#20 has been moved from
the south hot cell to the spent target vault.
It was placed in pail #150 and spot 1B in |
|
|
1581
|
Tuesday, July 11, 2017, 10:20 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#52 | Module move | TM#4 with Ta#52 has been moved from
the conditioning station to the east target
station. |
|
|
1583
|
Thursday, July 13, 2017, 10:53 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move | TM#3 has been moved from the north
east silo to the conditioning station. |
|
|
1586
|
Tuesday, July 18, 2017, 15:04 |
Travis Cave | Crane | Maintenance | | | Failure of the ISAC TH Crane Rotate. | Earlier in the day it was noted that
the rotate function of the crane had creased
operation. After David has finished the block |
|
|
1588
|
Monday, July 31, 2017, 09:44 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move | TM#3 has been moved back to the NE
silo from the conditioning station. |
|
|
1589
|
Tuesday, August 01, 2017, 14:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#36 | Electrical Check | The electrical check of TM#2 with SiC#36
attached. Post beam at the south hot cell.
See attached results allow the before beam |
 |
|
1593
|
Thursday, August 03, 2017, 15:02 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#36 | Spent Target Move | The spent SiC#36 has been moved from
the south hot cell to the spent target vault. |
|
|
1595
|
Tuesday, August 08, 2017, 13:26 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#53 | module moved | TM#2 with Ta#53 has been moved from the
conditioning station to the west target station. |
|
|
1602
|
Monday, August 28, 2017, 11:28 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#52 | Module move | TM#4 with Ta#52 has been moved from
the east station to the south hot cell. |
|
|
1604
|
Monday, August 28, 2017, 14:34 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#21 | Module move | TM#4 with UC#21 has been moved from
the south hot cell to the conditioning station. |
|
|
1605
|
Monday, August 28, 2017, 14:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#21 | Electrical Check | The results of the electrical check of
TM#4 with UC#21 attached. |
|
|
1608
|
Wednesday, August 30, 2017, 11:37 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#52 | Spent Target move | The spent Ta#52 target has been moved from
the south hot cell to the spent target vault.
See attached PDF for details. |
|
|
1610
|
Tuesday, September 05, 2017, 10:25 |
Travis Cave | ITE | Standard Operation | TM4 | UC#21 | Module move | TM#4 with UC#21 has been moved from
the conditioning station to the east target
station. |
|
|
1611
|
Friday, September 08, 2017, 11:20 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move | TM#3 has been moved from the north
east silo to the conditioning station. |
|
|
1616
|
Friday, September 15, 2017, 14:12 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move | TM#3 has been moved back to the silo
from the conditioning station. |
|
|
1618
|
Tuesday, September 19, 2017, 13:53 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#53 | Module move | TM#2 with Ta#53 has been moved from
the west target station to the south hot
cell. |
|
|
1620
|
Thursday, September 21, 2017, 10:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#53 | Electrical Check | Electrical checks of TM#2 with Ta#53 and
also with out a target. |
  |