  1565   Monday, June 26, 2017, 11:42 Travis CaveSouth Hot-CellStandard OperationTM4UC#20Module move

 TM#4 with UC#20 has been moved from the east target station to the south hot cell. Also the shield plug was remotely installed as well after David set it up.

  1567   Tuesday, June 27, 2017, 09:14 Travis CaveConditioning StationStandard OperationTM4Ta#52Module move

 TM#4 with Ta#52 has been moved from south hot cell to the conditioning station.

  1570   Wednesday, June 28, 2017, 09:14 Travis CaveConditioning StationStandard OperationTM4Ta#52Electrical Check

Results of electrical check of TM#4 with Ta#52 at the south hot cell and the conditioning station under vacuum.

Attachment 1: TM4_Ta52_Elec_chk_SHC_CSvac.PDF
TM4_Ta52_Elec_chk_SHC_CSvac.PDF TM4_Ta52_Elec_chk_SHC_CSvac.PDF
  1575   Thursday, June 29, 2017, 14:42 Travis CaveSpent Target VaultStandard Operation UC#20Spent Target Move

 The spent UC#20 has been moved from the south hot cell to the spent target vault. It was placed in pail #150 and spot 1B in the vault. See attached for details of the vault.

Attachment 1: Vault_Storage_June_29_2017.pdf
Vault_Storage_June_29_2017.pdf Vault_Storage_June_29_2017.pdf Vault_Storage_June_29_2017.pdf Vault_Storage_June_29_2017.pdf
  1581   Tuesday, July 11, 2017, 10:20 Travis CaveITEStandard OperationTM4Ta#52Module move

 TM#4 with Ta#52 has been moved from the conditioning station to the east target station.

  1583   Thursday, July 13, 2017, 10:53 Travis CaveConditioning StationStandard OperationTM3no targetModule move

 TM#3 has been moved from the north east silo to the conditioning station.

  1586   Tuesday, July 18, 2017, 15:04 Travis CaveCraneMaintenance  Failure of the ISAC TH Crane Rotate.

 Earlier in the day it was noted that the rotate function of the crane had creased operation. After David has finished the block moves. Don and I checked the Crane's control unit in the ISAC crane control room and found the breaker tripped for the rotation. The breaker was reset and the crane's rotation is now operational. If this occurs in the future only Travis Cave, Don Jackson or a TRIUMF Electrician are allowed in that control box as it is a 480Volt system. Don or I because we know what we are looking for and the Electrician because they are allowed to touch with and deal 480 V systems. 

  1588   Monday, July 31, 2017, 09:44 Travis CaveConditioning StationStandard OperationTM3no targetModule move

 TM#3 has been moved back to the NE silo from the conditioning station.

  1589   Tuesday, August 01, 2017, 14:39 Travis CaveSouth Hot-CellStandard OperationTM2SiC#36Electrical Check

The electrical check of TM#2 with SiC#36 attached. Post beam at the south hot cell. See attached results allow the before beam electrical check results are posted here as well.

Attachment 1: TM2_SiC36_SHC_elec_chk.PDF
TM2_SiC36_SHC_elec_chk.PDF
Attachment 2: TM2_SiC36_Postbeam_SHC_elec_chk.PDF
TM2_SiC36_Postbeam_SHC_elec_chk.PDF
  1593   Thursday, August 03, 2017, 15:02 Travis CaveSpent Target VaultStandard Operation SiC#36Spent Target Move

 The spent SiC#36 has been moved from the south hot cell to the spent target vault.

Attachment 1: Vault_Storage_August_3_2017.pdf
Vault_Storage_August_3_2017.pdf Vault_Storage_August_3_2017.pdf Vault_Storage_August_3_2017.pdf Vault_Storage_August_3_2017.pdf
  1595   Tuesday, August 08, 2017, 13:26 Travis CaveITWStandard OperationTM2Ta#53module moved

TM#2 with Ta#53 has been moved from the conditioning station to the west target station.

  1602   Monday, August 28, 2017, 11:28 Travis CaveITEStandard OperationTM4Ta#52Module move

 TM#4 with Ta#52 has been moved from the east station to the south hot cell.

  1604   Monday, August 28, 2017, 14:34 Travis CaveConditioning StationStandard OperationTM4UC#21Module move

 TM#4 with UC#21 has been moved from the south hot cell to the conditioning station.

  1605   Monday, August 28, 2017, 14:40 Travis CaveSouth Hot-CellStandard OperationTM4UC#21Electrical Check

The results of the electrical check of TM#4 with UC#21 attached.

Attachment 1: TM4_UC21_elecchk_SHC.PDF
TM4_UC21_elecchk_SHC.PDF
  1608   Wednesday, August 30, 2017, 11:37 Travis CaveSpent Target VaultStandard Operation Ta#52Spent Target move

The spent Ta#52 target has been moved from the south hot cell to the spent target vault. See attached PDF for details.

Attachment 1: Vault_Storage_August_30_2017.pdf
Vault_Storage_August_30_2017.pdf Vault_Storage_August_30_2017.pdf Vault_Storage_August_30_2017.pdf Vault_Storage_August_30_2017.pdf
  1610   Tuesday, September 05, 2017, 10:25 Travis CaveITEStandard OperationTM4UC#21Module move

 TM#4 with UC#21 has been moved from the conditioning station to the east target station.

  1611   Friday, September 08, 2017, 11:20 Travis CaveConditioning StationStandard OperationTM3no targetModule move

 TM#3 has been moved from the north east silo to the conditioning station.

  1616   Friday, September 15, 2017, 14:12 Travis CaveConditioning StationStandard OperationTM3no targetModule move

 TM#3 has been moved back to the silo from the conditioning station.

  1618   Tuesday, September 19, 2017, 13:53 Travis CaveSouth Hot-CellStandard OperationTM2Ta#53Module move

 TM#2 with Ta#53 has been moved from the west target station to the south hot cell.

  1620   Thursday, September 21, 2017, 10:48 Travis CaveSouth Hot-CellStandard OperationTM2Ta#53Electrical Check

Electrical checks of TM#2 with Ta#53 and also with out a target.

Attachment 1: TM2_Ta53_elec_chk_shc.PDF
TM2_Ta53_elec_chk_shc.PDF
Attachment 2: TM2_Ta53_elec_chk_post_beam_shc.PDF
TM2_Ta53_elec_chk_post_beam_shc.PDF
Attachment 3: TM2_notgt_elec_chk_shc_09202017.PDF
TM2_notgt_elec_chk_shc_09202017.PDF