Monday, July 31, 2017, 09:44, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, Module move
|
TM#3 has been moved back to the NE silo from the conditioning station. |
Tuesday, August 01, 2017, 14:39, Travis Cave, South Hot-Cell, Standard Operation, TM2, SiC#36, Electrical Check
|
The electrical check of TM#2 with SiC#36 attached. Post beam at the south hot cell. See attached results allow the before beam electrical check results
are posted here as well. |
Thursday, August 03, 2017, 15:02, Travis Cave, Spent Target Vault, Standard Operation, , SiC#36, Spent Target Move
|
The spent SiC#36 has been moved from the south hot cell to the spent target vault. |
Tuesday, August 08, 2017, 13:26, Travis Cave, ITW, Standard Operation, TM2, Ta#53, module moved
|
TM#2 with Ta#53 has been moved from the conditioning station to the west target station. |
Monday, August 28, 2017, 11:28, Travis Cave, ITE, Standard Operation, TM4, Ta#52, Module move
|
TM#4 with Ta#52 has been moved from the east station to the south hot cell. |
Monday, August 28, 2017, 14:34, Travis Cave, Conditioning Station, Standard Operation, TM4, UC#21, Module move
|
TM#4 with UC#21 has been moved from the south hot cell to the conditioning station. |
Monday, August 28, 2017, 14:40, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#21, Electrical Check
|
The results of the electrical check of TM#4 with UC#21 attached. |
Wednesday, August 30, 2017, 11:37, Travis Cave, Spent Target Vault, Standard Operation, , Ta#52, Spent Target move
|
The spent Ta#52 target has been moved from the south hot cell to the spent target vault. See attached PDF for details. |
Tuesday, September 05, 2017, 10:25, Travis Cave, ITE, Standard Operation, TM4, UC#21, Module move
|
TM#4 with UC#21 has been moved from the conditioning station to the east target station. |
Friday, September 08, 2017, 11:20, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, Module move
|
TM#3 has been moved from the north east silo to the conditioning station. |
Friday, September 15, 2017, 14:12, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, Module move
|
TM#3 has been moved back to the silo from the conditioning station. |
Tuesday, September 19, 2017, 13:53, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#53, Module move
|
TM#2 with Ta#53 has been moved from the west target station to the south hot cell. |
Thursday, September 21, 2017, 10:48, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#53, Electrical Check
|
Electrical checks of TM#2 with Ta#53 and also with out a target. |
Friday, September 22, 2017, 11:00, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Electrical Check
|
Electrical check of TM#2 after the insulator change on thursday september 21. |
Tuesday, September 26, 2017, 14:27, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#54, Electrical Check
|
Electrical check of TM#2 with Ta#54 at the south hot cell. See attached PDF for details. |
Wednesday, September 27, 2017, 09:02, Travis Cave, Conditioning Station, Standard Operation, TM2, Ta#54, Module move
|
TM#2 with Ta#54 has been moved from the south hot cell to the conditioning station. |
Thursday, September 28, 2017, 11:59, Travis Cave, Spent Target Vault, Standard Operation, , Ta#53, Spent Target move
|
The spent Ta#53 has been moved to the spent target vault. See attached file for details. |
Tuesday, October 03, 2017, 09:29, Travis Cave, ITW, Standard Operation, TM2, Ta#54, Module move
|
TM#2 with Ta#54 has been moved from the conditioning station to the west target station. |
Thursday, October 12, 2017, 08:48, Travis Cave, Spent Target Vault, Standard Operation, , , Field measurements of the old source trays
|
Field measurements were taken of the old source trays. The old TM#2 source tray had a minimum field value of 0.50 mSv/hr and a maximum of 1.18
mSv/hr through 360 deg of rotation. The box was rotated around three times and put back in the vault. TM#1 old source tray was also removed and measured
as well the field values for it were a minimum of 0.52 mSv/hr and a maximum of 1.15 mSv/hr through 360 deg of rotation. The box was rotated around three |
Tuesday, October 17, 2017, 10:56, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#21, Module move
|
TM#4 with UC#21 has been moved from the east target station to the south hot cell. |
|