1372
|
Wednesday, October 19, 2016, 11:46 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module moved | TM#2 has been moved from the south hot
cell to the south west silo. |
|
|
1373
|
Thursday, October 20, 2016, 10:45 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#49 | Spent Target move | Ta#49 has been removed from the south hot
cell and placed in the storage vault. It
is in pail 146 and in spot 6A. |
|
|
1378
|
Monday, October 24, 2016, 11:34 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module moved | TM#2 has been moved from the south west
silo to the south hot cell. |
|
|
1382
|
Monday, October 24, 2016, 14:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#35 | Electrical Checks | Results of the electrical check of TM#2
with no target after the repair and with
the SiC#35 mounted on the module. |
 |
|
1388
|
Wednesday, November 02, 2016, 09:12 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#50 | module moved | TM#4 with Ta#50 has been moved from the
south hot cell to the conditioning station. |
|
|
1392
|
Monday, November 07, 2016, 10:35 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#34 | Spent Target move | Spent SiC#34 was moved on the 3rd of November
and placed in the spent target vault.
See attached pdf for details. |
|
|
1394
|
Tuesday, November 08, 2016, 10:23 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#50 | module moved | TM#4 with Ta#50 has been moved to the east
target station. |
|
|
1398
|
Tuesday, November 22, 2016, 10:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#35 | module moved | TM#2 with the old SiC #35 has been moved
from ITW to the south hot cell. |
|
|
1399
|
Tuesday, November 22, 2016, 11:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#35 | Electrical Check | Electrical check of TM#2 with the SiC#35
post beam run. See attached PDF for details. |
|
|
1401
|
Wednesday, November 23, 2016, 14:21 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | UC#18 | module moved | TM#2 with UC#18 has been moved from the
south hot cell to the conditioning station. |
|
|
1402
|
Wednesday, November 23, 2016, 14:25 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | UC#18 | Electrical Check | Results of TM#2 with UC#18 electrical at
the south hot cell. See attached PDF for
details. |
|
|
1407
|
Friday, November 25, 2016, 09:04 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#35 | Spent Target move | On November 24th 2016 the spent SiC#35
was moved from the south hot cell to the
spent target vault. see attached pdf for |
|
|
1411
|
Tuesday, November 29, 2016, 14:50 |
Travis Cave | ITW | Standard Operation | TM2 | UC#18 | module moved | TM#2 with UC#18 has been moved to ITW from
the conditioning station. |
|
|
1454
|
Tuesday, March 21, 2017, 10:05 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target assay. | All target in the ISAC spent target vault
have been either assayed or had their fields
measured or both. |
|
|
1455
|
Tuesday, March 21, 2017, 10:06 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | no target | module moved | TM#4 has been moved from the SW Silo to
the conditioning station. |
|
|
1457
|
Wednesday, March 22, 2017, 14:05 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | test target | module moved | TM#2 has been moved from the east target
station to the south hot cell. |
|
|
1458
|
Thursday, March 23, 2017, 09:30 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | test target | Electrical Check | Electrical check of the Ta test target
on TM#2 |
|
|
1463
|
Friday, March 24, 2017, 13:21 |
Travis Cave | Spent Target Vault | Standard Operation | | 2A window | 2A window has been removed from the vault. | 2A window has been removed from the vault
and moved over the cyclotron vault tunnels.
Attached is the updated storage vault list. |
|
|
1466
|
Monday, March 27, 2017, 13:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Electrical Check | Did the start of the running year electrical
checks of both TM#2 and TM#4 with no target
attached to either module. TM#2 was in the |
 |
|
1467
|
Tuesday, March 28, 2017, 09:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module moved | TM#4 has been moved from the conditioning
station to the south hot cell. |
|