Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 37 of 140  Not logged in ELOG logo
  ID Date Authordown Category Type Module Target/Number Subject
  1372   Wednesday, October 19, 2016, 11:46 Travis CaveSouth Hot-CellStandard OperationTM2no targetmodule moved

TM#2 has been moved from the south hot cell to the south west silo.

  1373   Thursday, October 20, 2016, 10:45 Travis CaveSpent Target VaultStandard Operation Ta#49Spent Target move

Ta#49 has been removed from the south hot cell and placed in the storage vault. It is in pail 146 and in spot 6A.

  1378   Monday, October 24, 2016, 11:34 Travis CaveSouth Hot-CellStandard OperationTM2no targetmodule moved

TM#2 has been moved from the south west silo to the south hot cell.

  1382   Monday, October 24, 2016, 14:56 Travis CaveSouth Hot-CellStandard OperationTM2SiC#35Electrical Checks

Results of the electrical check of TM#2 with no target after the repair and with the SiC#35 mounted on the module.

Attachment 1: TM2_elechk_notgt_SHC_repair.PDF
TM2_elechk_notgt_SHC_repair.PDF
Attachment 2: TM2_elechk_SiC35_SHC.PDF
TM2_elechk_SiC35_SHC.PDF
  1388   Wednesday, November 02, 2016, 09:12 Travis CaveConditioning StationStandard OperationTM4Ta#50module moved

TM#4 with Ta#50 has been moved from the south hot cell to the conditioning station.

  1392   Monday, November 07, 2016, 10:35 Travis CaveSpent Target VaultStandard Operation SiC#34Spent Target move

Spent SiC#34 was moved on the 3rd of November and  placed in the spent target vault. See attached pdf for details.

Attachment 1: Vault_Storage_November_3_2016.pdf
Vault_Storage_November_3_2016.pdf Vault_Storage_November_3_2016.pdf Vault_Storage_November_3_2016.pdf Vault_Storage_November_3_2016.pdf
  1394   Tuesday, November 08, 2016, 10:23 Travis CaveITEStandard OperationTM4Ta#50module moved

TM#4 with Ta#50 has been moved to the east target station.

  1398   Tuesday, November 22, 2016, 10:45 Travis CaveSouth Hot-CellStandard OperationTM2SiC#35module moved

TM#2 with the old SiC #35 has been moved from ITW to the south hot cell.

  1399   Tuesday, November 22, 2016, 11:56 Travis CaveSouth Hot-CellStandard OperationTM2SiC#35Electrical Check

Electrical check of TM#2 with the SiC#35  post beam run. See attached PDF for details.

Attachment 1: TM2_elechk_SiC35_postbeam.PDF
TM2_elechk_SiC35_postbeam.PDF
  1401   Wednesday, November 23, 2016, 14:21 Travis CaveConditioning StationStandard OperationTM2UC#18module moved

TM#2 with UC#18 has been moved from the south hot cell to the conditioning station.

  1402   Wednesday, November 23, 2016, 14:25 Travis CaveSouth Hot-CellStandard OperationTM2UC#18Electrical Check

Results of TM#2 with UC#18 electrical at the south hot cell. See attached PDF for details.

Attachment 1: TM2_elechk_UC18_SHC.PDF
TM2_elechk_UC18_SHC.PDF
  1407   Friday, November 25, 2016, 09:04 Travis CaveSpent Target VaultStandard Operation SiC#35Spent Target move

On November 24th 2016 the spent SiC#35 was moved from the south hot cell to the spent target vault. see attached pdf for details.

Attachment 1: Vault_Storage_November_24_2016.pdf
Vault_Storage_November_24_2016.pdf Vault_Storage_November_24_2016.pdf Vault_Storage_November_24_2016.pdf Vault_Storage_November_24_2016.pdf
  1411   Tuesday, November 29, 2016, 14:50 Travis CaveITWStandard OperationTM2UC#18module moved

TM#2 with UC#18 has been moved to ITW from the conditioning station.

  1454   Tuesday, March 21, 2017, 10:05 Travis CaveSpent Target VaultStandard Operation  Spent target assay.

All target in the ISAC spent target vault have been either assayed or had their fields measured or both.

Attachment 1: Vault_Storage_March_20_2017.pdf
Vault_Storage_March_20_2017.pdf Vault_Storage_March_20_2017.pdf Vault_Storage_March_20_2017.pdf Vault_Storage_March_20_2017.pdf
  1455   Tuesday, March 21, 2017, 10:06 Travis CaveConditioning StationStandard OperationTM4no targetmodule moved

TM#4 has been moved from the SW Silo to the conditioning station.

  1457   Wednesday, March 22, 2017, 14:05 Travis CaveSouth Hot-CellStandard OperationTM2test targetmodule moved

TM#2 has been moved from the east target station to the south hot cell.

  1458   Thursday, March 23, 2017, 09:30 Travis CaveSouth Hot-CellStandard OperationTM2test targetElectrical Check

Electrical check of the Ta test target on TM#2

Attachment 1: TM2_Ta_Dummytgt_Preandpost.PDF
TM2_Ta_Dummytgt_Preandpost.PDF TM2_Ta_Dummytgt_Preandpost.PDF
  1463   Friday, March 24, 2017, 13:21 Travis CaveSpent Target VaultStandard Operation 2A window2A window has been removed from the vault.

2A window has been removed from the vault and moved over the cyclotron vault tunnels.  Attached is the updated storage vault list.

Attachment 1: Vault_Storage_March_24_2017.pdf
Vault_Storage_March_24_2017.pdf Vault_Storage_March_24_2017.pdf Vault_Storage_March_24_2017.pdf Vault_Storage_March_24_2017.pdf
  1466   Monday, March 27, 2017, 13:40 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical Check

Did the start of the running year electrical checks of both TM#2 and TM#4 with no target attached to either module. TM#2 was in the south hot cell and TM#4 is in the conditioning station under vacuum.

Attachment 1: TM2__No_Tgt.PDF
TM2__No_Tgt.PDF
Attachment 2: TM4__No_Tgt.PDF
TM4__No_Tgt.PDF
  1467   Tuesday, March 28, 2017, 09:18 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule moved

TM#4 has been moved from the conditioning station to the south hot cell.

ELOG V2.9.2-2455