  1398   Tuesday, November 22, 2016, 10:45 Travis CaveSouth Hot-CellStandard OperationTM2SiC#35module moved

TM#2 with the old SiC #35 has been moved from ITW to the south hot cell.

  1399   Tuesday, November 22, 2016, 11:56 Travis CaveSouth Hot-CellStandard OperationTM2SiC#35Electrical Check

Electrical check of TM#2 with the SiC#35  post beam run. See attached PDF for details.

Attachment 1: TM2_elechk_SiC35_postbeam.PDF
TM2_elechk_SiC35_postbeam.PDF
  1401   Wednesday, November 23, 2016, 14:21 Travis CaveConditioning StationStandard OperationTM2UC#18module moved

TM#2 with UC#18 has been moved from the south hot cell to the conditioning station.

  1402   Wednesday, November 23, 2016, 14:25 Travis CaveSouth Hot-CellStandard OperationTM2UC#18Electrical Check

Results of TM#2 with UC#18 electrical at the south hot cell. See attached PDF for details.

Attachment 1: TM2_elechk_UC18_SHC.PDF
TM2_elechk_UC18_SHC.PDF
  1407   Friday, November 25, 2016, 09:04 Travis CaveSpent Target VaultStandard Operation SiC#35Spent Target move

On November 24th 2016 the spent SiC#35 was moved from the south hot cell to the spent target vault. see attached pdf for details.

Attachment 1: Vault_Storage_November_24_2016.pdf
Vault_Storage_November_24_2016.pdf Vault_Storage_November_24_2016.pdf Vault_Storage_November_24_2016.pdf Vault_Storage_November_24_2016.pdf
  1411   Tuesday, November 29, 2016, 14:50 Travis CaveITWStandard OperationTM2UC#18module moved

TM#2 with UC#18 has been moved to ITW from the conditioning station.

  1454   Tuesday, March 21, 2017, 10:05 Travis CaveSpent Target VaultStandard Operation  Spent target assay.

All target in the ISAC spent target vault have been either assayed or had their fields measured or both.

Attachment 1: Vault_Storage_March_20_2017.pdf
Vault_Storage_March_20_2017.pdf Vault_Storage_March_20_2017.pdf Vault_Storage_March_20_2017.pdf Vault_Storage_March_20_2017.pdf
  1455   Tuesday, March 21, 2017, 10:06 Travis CaveConditioning StationStandard OperationTM4no targetmodule moved

TM#4 has been moved from the SW Silo to the conditioning station.

  1457   Wednesday, March 22, 2017, 14:05 Travis CaveSouth Hot-CellStandard OperationTM2test targetmodule moved

TM#2 has been moved from the east target station to the south hot cell.

  1458   Thursday, March 23, 2017, 09:30 Travis CaveSouth Hot-CellStandard OperationTM2test targetElectrical Check

Electrical check of the Ta test target on TM#2

Attachment 1: TM2_Ta_Dummytgt_Preandpost.PDF
TM2_Ta_Dummytgt_Preandpost.PDF TM2_Ta_Dummytgt_Preandpost.PDF
  1463   Friday, March 24, 2017, 13:21 Travis CaveSpent Target VaultStandard Operation 2A window2A window has been removed from the vault.

2A window has been removed from the vault and moved over the cyclotron vault tunnels.  Attached is the updated storage vault list.

Attachment 1: Vault_Storage_March_24_2017.pdf
Vault_Storage_March_24_2017.pdf Vault_Storage_March_24_2017.pdf Vault_Storage_March_24_2017.pdf Vault_Storage_March_24_2017.pdf
  1466   Monday, March 27, 2017, 13:40 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical Check

Did the start of the running year electrical checks of both TM#2 and TM#4 with no target attached to either module. TM#2 was in the south hot cell and TM#4 is in the conditioning station under vacuum.

Attachment 1: TM2__No_Tgt.PDF
TM2__No_Tgt.PDF
Attachment 2: TM4__No_Tgt.PDF
TM4__No_Tgt.PDF
  1467   Tuesday, March 28, 2017, 09:18 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule moved

TM#4 has been moved from the conditioning station to the south hot cell.

  1468   Tuesday, March 28, 2017, 10:30 Travis CaveSouth Hot-CellStandard OperationTM4UC#19Electrical Check

Electrical check done on TM#4 with UC#19. See attached PDF for results.

Attachment 1: TM4__UC19_SHC.PDF
TM4__UC19_SHC.PDF
  1473   Tuesday, April 04, 2017, 09:29 Travis CaveITEStandard OperationTM4UC#19module moved

TM#4 with UC#19 has been moved from the conditioning station to the east target station.

  1478   Wednesday, April 05, 2017, 09:46 Travis CaveConditioning StationStandard OperationTM1no targetmodule moved

TM#1 has been moved from the North West silo to the conditioning station.

  1484   Friday, April 07, 2017, 09:53 Travis CaveConditioning StationMaintenanceTM1no targetElectrical Check and TM1 other checks

Results of an electrical check on TM#1 with no target attached to it.

 I use this e-log entry for TM1 notes as well  1. TM1 IG1 is a dual filament gauge . Its filament is very close to grid now. It shorted one time during the pumping down. It still works fine so far . But, we may need to change it if we use this module in TS again.

TCS 1G1 and 1G1S are pumped to 5Xe-6 torr. IG2 stayed at 2.5XE-5 torr. Since no target is installed on module , I capped top of HS water line. Maybe, the small o-ring seal in cap is too old, I found a big leak on this seal when i use LD check it. That is the reason IG2 stayed too high. Still, Leak check and helium presuure test are fulfilled on TM1. Leak detector BLR 5XE-7 atm.cc/sec, BP 0.0XE-4 torr9.  Back up pressure is 51 mtorr which is high because of leak on HS line cap seal so LD BLR is high. At this level, Ta+-, Tube +-, MSP,  EE are good.  Other air to vacuum seal are good as well at this leak rate.  I will check and change small o-ring seal in HS cap. The TM1 is functional basically.

Attachment 1: TM1_elec_chk_no_tgt.PDF
TM1_elec_chk_no_tgt.PDF
  1485   Monday, April 10, 2017, 11:23 Travis CaveConditioning StationStandard OperationTM1no targetModule move

 TM#1 has been moved from the conditioning station to the north west silo.  There was a slight delay in the move as the limits for the hoist drum got way out of whack and had to be adjusted.

  1486   Tuesday, April 11, 2017, 11:30 Travis CaveSouth Hot-CellStandard OperationTM2Ta#51Electrical Check

Electrical check performed on TM#2 with Ta#51, see attached PDF.

Attachment 1: TM2_Ta51_SHC_elec_chk.PDF
TM2_Ta51_SHC_elec_chk.PDF
  1487   Tuesday, April 11, 2017, 14:02 Travis CaveConditioning StationStandard OperationTM2Ta#51module moved

TM#2 with Ta#51 has been moved from the south hot cell to the conditioning station.