  RH-ISAC, Page 36 of 138  Not logged in ELOG logo
  ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  1312   Wednesday, August 10, 2016, 09:44 Travis CaveConditioning StationStandard OperationTM3no targetmodule movedTM#3 has been moved from the north east
silo to the conditioning station.
  
  1325   Thursday, August 18, 2016, 14:19 Travis CaveConditioning StationStandard OperationTM3no targetmodule movedTM#3 is now back in the the north east
silo.
  
  1327   Tuesday, August 23, 2016, 10:39 Travis CaveSouth Hot-CellStandard OperationTM2SiC#33module movedTM#3 with SiC#33 has been moved from the
west station to the south hot cell.
  
  1334   Wednesday, August 24, 2016, 11:06 Travis CaveSouth Hot-CellStandard OperationTM2Ta#49module moved and electrical checkTM#2 with Ta#49 has had its electrical
check and was moved to the conditioning station.
see the attached pdf for the electrical check
 TM2_elechk_SiC34_SHC.PDF 
  1340   Thursday, August 25, 2016, 14:25 Travis CaveSpent Target VaultStandard Operation SiC#33Spent Target moveSiC#33 was placed into pail #141 which
in turn was placed into slot 2B of the vault.
I was 295mS/hr upon removal from the south
 Vault_Storage_August_25_2016.pdf 
  1342   Tuesday, August 30, 2016, 10:35 Travis CaveITWStandard OperationTM2Ta#49module movedTM#2 with Ta#49 has been moved to the west
target station from the conditioning station.
  
  1346   Wednesday, September 07, 2016, 11:44 Travis CaveConditioning StationStandard OperationTM3no targetmodule movedTM#3 has been moved from the NE Silo to
the conditioning station.
  
  1352   Wednesday, September 14, 2016, 13:53 Travis CaveConditioning StationStandard OperationTM3no targetModule moveTM#3, no target, has been moved from the
conditioning station to the north east silo.
  
  1355   Tuesday, September 20, 2016, 10:32 Travis CaveSouth Hot-CellStandard OperationTM4UC#17module movedTM#4 has been moved from the east target
station to the south hot cell
  
  1360   Friday, September 23, 2016, 08:55 Travis CaveConditioning StationStandard OperationTM4SiC#34Electrical ChecksThe bundle of electrical checks, first
one is the Iglis that failed, the second
is the everything passed at the hot cell
 TM4_elechk_SiC34_SHC.PDF 
  1362   Monday, September 26, 2016, 13:59 Travis CaveSpent Target VaultStandard Operation UC#17Spent Target moveThe spent UC#17 has been moved from the
south hot cell to the spent target vault.
See the attached pdf for details.
 Vault_Storage_September_26_2016.pdf 
  1364   Tuesday, September 27, 2016, 09:13 Travis CaveITEStandard OperationTM4SiC#34module movedTM#4 with SiC #34 has been moved to the
east target station.
  
  1369   Tuesday, October 11, 2016, 10:36 Travis CaveITWStandard OperationTM2Ta#49module movedTM#2 with Ta#49 has been moved from the
west target station to the south hot cell.
  
  1372   Wednesday, October 19, 2016, 11:46 Travis CaveSouth Hot-CellStandard OperationTM2no targetmodule movedTM#2 has been moved from the south hot
cell to the south west silo.
  
  1373   Thursday, October 20, 2016, 10:45 Travis CaveSpent Target VaultStandard Operation Ta#49Spent Target moveTa#49 has been removed from the south hot
cell and placed in the storage vault. It
is in pail 146 and in spot 6A.
  
  1378   Monday, October 24, 2016, 11:34 Travis CaveSouth Hot-CellStandard OperationTM2no targetmodule movedTM#2 has been moved from the south west
silo to the south hot cell.
  
  1382   Monday, October 24, 2016, 14:56 Travis CaveSouth Hot-CellStandard OperationTM2SiC#35Electrical ChecksResults of the electrical check of TM#2
with no target after the repair and with
the SiC#35 mounted on the module.
 TM2_elechk_notgt_SHC_repair.PDFTM2_elechk_SiC35_SHC.PDF 
  1388   Wednesday, November 02, 2016, 09:12 Travis CaveConditioning StationStandard OperationTM4Ta#50module movedTM#4 with Ta#50 has been moved from the
south hot cell to the conditioning station.
  
  1392   Monday, November 07, 2016, 10:35 Travis CaveSpent Target VaultStandard Operation SiC#34Spent Target moveSpent SiC#34 was moved on the 3rd of November
and  placed in the spent target vault.
See attached pdf for details.
 Vault_Storage_November_3_2016.pdf 
  1394   Tuesday, November 08, 2016, 10:23 Travis CaveITEStandard OperationTM4Ta#50module movedTM#4 with Ta#50 has been moved to the east
target station.
  