790
|
Tuesday, November 18, 2014, 10:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#44 | module move |
TM#4 with Ta#44 has been moved from the east target station to the south hot cell. |
794
|
Wednesday, November 19, 2014, 09:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#11 | Electrical check |
TM#4 with UC#11 electrical check done. See attached PDF for the results. |
Attachment 1: TM4_elec_check_UC11_SHC.PDF
|
|
796
|
Thursday, November 20, 2014, 11:49 |
Travis Cave | ITE | Standard Operation | TM4 | UC#11 | module move |
TM#4 with UCx#11has been moved from the conditioning station to the east target station. |
799
|
Friday, November 21, 2014, 10:40 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#44 | Spent target move |
The spent Ta#44 target has been removed from the south hot cell, it was placed in pail #121 and placed in spot 4A of the storage vault. It was 276mSv/hr upon removal from the south hot cell. |
Attachment 1: Vault_Storage_November_21_2014.pdf
|
|
802
|
Wednesday, November 26, 2014, 11:11 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#38, Nb#7, TiC#3, NiO#2, and SiC#29 | Spent targets moved to mini storage |
The following targets have been moved to the mini storage from the target storage vault:
- Ta#38
- Nb#7
- TiC#3
- SiC#29
- NiO#2
These target will be removed from the mini storage and placed into the F-308's on December 3rd. |
803
|
Friday, November 28, 2014, 13:06 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module move |
TM#2 with no target or source tray has been moved from the north east silo to the south hot cell. |
806
|
Monday, December 01, 2014, 14:48 |
Travis Cave | Spent Target Vault | Standard Operation | | | F-308s moved |
The F-308s have been moved into the target hall, for filling on wednesday. |
809
|
Thursday, December 04, 2014, 09:49 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module move |
TM#2 has been moved from the south hot cell to the conditioning station. |
810
|
Thursday, December 04, 2014, 09:54 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Electrical check |
Results of electrical check of TM#2 with no source tray and no containment box attached. See PDF for results. |
Attachment 1: TM2_elec_check_no_source_traySHC.PDF
|
|
811
|
Thursday, December 04, 2014, 09:57 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target placed in F-308. |
Spent targets in the mini storage were placed into the F-308s yesterday, all F-308 have been removed from the the target hall and they no reside for the time being in the hallway between the north and south hot cells. |
857
|
Tuesday, March 10, 2015, 09:01 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ThO#1 | Module move |
TM#1 has been moved from the west station to the south hot cell had the ThO#1 target removed and then the modules was moved from the south hot cell to the south west silo. Also an electrical check was done on the target before it was removed. |
Attachment 1: TM1_THO_elec_chk_postbeamSHC.PDF
|
|
858
|
Thursday, March 12, 2015, 09:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | No target | Module move |
TM#2 with no target and no source tray has been moved from the conditioning station to the north east silo. |
861
|
Friday, March 13, 2015, 13:36 |
Travis Cave | Spent Target Vault | Standard Operation | | ThO#1 | Spent Target Move |
The ThO#1 has been placed in the storage vault placed in pail #122 in spot 2B of the vault. It was 6.2mSv/hr upon removal from the south hot cell. see attached PDF for details. |
Attachment 1: Storage_Vault_March_13_2015.pdf
|
|
862
|
Monday, March 16, 2015, 09:41 |
Travis Cave | ITE | Standard Operation | TM4 | UC#11 | Module move |
TM#4 with UC#11 moved from the east target station to the south hot cell. |
863
|
Monday, March 16, 2015, 14:16 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | No target | Module move |
TM#4 from south hot cell to the conditioning station no target is attached to the module. |
864
|
Tuesday, March 17, 2015, 10:33 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#11 | Spent Target Move |
The spent UC#11 has benn moved from the south hot cell to the spent target vault. See attached PDF for details. |
Attachment 1: Vault_Storage_March_17_2015.pdf
|
|
868
|
Tuesday, March 24, 2015, 08:46 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | No target | Module move |
TM#4 with no target has been moved from conditioning station to the south hot cell. |
870
|
Tuesday, March 24, 2015, 13:57 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#45 | Electrical check |
TM#4 electrical checks with and without the target installed, installed target is Ta#45. |
Attachment 1: TM4_no_tgt_elec_chk_CS.PDF
|
|
Attachment 2: TM4_Ta45_elec_chk_SHC.PDF
|
|
874
|
Thursday, March 26, 2015, 09:20 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#45 | Electrical check |
Electrical check of TM#4 with Ta#45 at the conditioning station, see attached pdf for details. |
Attachment 1: TM4_Ta#45_tgt_elec_chk_CS.PDF
|
|
881
|
Wednesday, April 01, 2015, 10:52 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#45 | Module move |
TM#4 with Ta#45 has been moved from the conditioning station to the east target station. |