ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
|
1411
|
Tuesday, November 29, 2016, 14:50 |
Travis Cave | ITW | Standard Operation | TM2 | UC#18 | module moved | TM#2 with UC#18 has been moved to ITW from
the conditioning station. |
|
|
1297
|
Tuesday, August 02, 2016, 14:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#17 | module moved | TM#4 with UC#17 is now in the conditioning
station. |
|
|
1298
|
Tuesday, August 02, 2016, 15:22 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#17 | TM4 with new target has been connected at TCS | It is being pumped now at TCS. |
|
|
1299
|
Wednesday, August 03, 2016, 08:08 |
Anders Mjos | Conditioning Station | Standard Operation | TM4 | UC#17 | Conditioning UC#17 | Wednesday, August 03, 2016, 08:08: RGA
on
Wednesday, August 03, 2016, 11:25: |
|
|
1301
|
Wednesday, August 03, 2016, 09:45 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#17 | Helium pressure test on TM4 HS line at TCS | Helium pressure test on TM4 HS line at
TCS is done.Leak detector 0.0X E-9atm.cc/sec.
5minutes, 70psi helium. |
|
|
1304
|
Wednesday, August 03, 2016, 10:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#17 | Electrical Check | The result of yesterdays electrical check
on TM#4 with UC#17. |
|
|
1310
|
Tuesday, August 09, 2016, 10:05 |
Travis Cave | ITE | Standard Operation | TM4 | UC#17 | module moved | TM#4 with UC#17 is now in the east target
station. |
|
|
1313
|
Wednesday, August 10, 2016, 11:30 |
David Wang | ITE | Standard Operation | TM4 | UC#17 | TM4 has been connected at ITE | Dan and I connected TM4 in ITE yesterday.
It is pumping down at ITE now. Everything
is fine so far. |
|
|
1319
|
Monday, August 15, 2016, 10:08 |
David Wang | ITE | Standard Operation | TM4 | UC#17 | 5 Shielding blocks have been transferred from ITW to ITE. | Dan and I transferred 5 shielding blocks
from ITW to ITE. The ITE is configured to
take proton beam. |
|
|
1355
|
Tuesday, September 20, 2016, 10:32 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#17 | module moved | TM#4 has been moved from the east target
station to the south hot cell |
|
|
1362
|
Monday, September 26, 2016, 13:59 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#17 | Spent Target move | The spent UC#17 has been moved from the
south hot cell to the spent target vault.
See the attached pdf for details. |
|
|
1256
|
Tuesday, June 07, 2016, 17:11 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#16 | TM4 UCx16 electrical check and leak check at SHC | Chad and I finished the TM4 UCx6 electrical
check and leak check at SHC. Leak check result
on HS line is good. There is a dead short |
|
|
1257
|
Tuesday, June 07, 2016, 17:14 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#16 | TM4 with UCx16 target has been moved from SHC to TCS. | Bill and Yasmine did the move remotely
this afternoon. The move is successful. |
|
|
1258
|
Tuesday, June 07, 2016, 18:17 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#16 | TM4 and TCS turbo pumps are started. | TM4 and TCS vacuum system are connected.
Turbo pumps are started. Everything
is fine so far. |
|
|
1259
|
Wednesday, June 08, 2016, 08:25 |
Anders Mjos | Conditioning Station | Standard Operation | TM4 | UC#16 | Conditioning UC#16 | Wednesday, June 08, 2016, 08:15:
RGA on
Thursday, June 09, 2016, |
|
|
1260
|
Thursday, June 09, 2016, 08:37 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#16 | TM4 with UCx16 helium pressure test at TCS | I did a helium pressure test on TM4 at
TCS with UCX16 target installed on the module.
No leak has been found on all using water |
|
|
1261
|
Thursday, June 09, 2016, 09:44 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#16 | TM4 has been connected at TCS | It is ready for HV conditioning/ heating. |
|
|
1263
|
Tuesday, June 14, 2016, 08:04 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#16 | TM4 has been disconnected at TCS | The TM4 and TCS are vented with argon. |
|
|
1264
|
Tuesday, June 14, 2016, 10:51 |
Travis Cave | ITE | Standard Operation | TM4 | UC#16 | module moved | TM#4 with UC#16 has been moved from the
conditioning station to the east target station. |
|
|
1295
|
Tuesday, August 02, 2016, 11:02 |
Travis Cave | ITE | Standard Operation | TM4 | UC#16 | module moved | TM#4 with UC#16 has been moved from the
east station to the south hot cell. The shield
plug was also install remotely once it was |
|