211
|
Friday, November 09, 2012, 09:20 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | TiC#3 | Electrical check | Electrical check performed on TM#1 with
TiC#3 at the conditioning station under vacuum.
See PDF for details. |
|
|
227
|
Tuesday, January 08, 2013, 08:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | TiC#3 | Electrical check | TM#1 with TiC #3 post beam. See attached
PDF for results. |
|
|
228
|
Tuesday, January 08, 2013, 14:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Electrical check | TM#1 was electrically check with out a
target see attached PDF for results. |
|
|
235
|
Friday, January 18, 2013, 09:10 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | CS Test Target #1 | Electrical check | Electrical check performed on the CS Test
Target #1 at the south hot cell. See PDF
for details. |
|
|
278
|
Tuesday, March 26, 2013, 14:17 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#28 (RFQ Target) | Electrical check | Electrical check of TM#4 SiC#28 (RFQ Target)
has been completed. It passed the standard
electrical checks for the target part, but |
|
|
286
|
Wednesday, April 03, 2013, 14:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#39 | Electrical check | Electrical check on TM#1 with Ta#39 installed
at the south hot cell. Target passed the
electrical checks, see attached pdf for details. |
|
|
290
|
Monday, April 08, 2013, 09:01 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Ta#39 | Electrical check | TM#1 with Ta#39 at the conditioning station,
has failed its electrical test see attached
pdf for details. Also while setting up for |
|
|
291
|
Monday, April 08, 2013, 12:10 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Ta#39 | Electrical check | TM#1 with Ta#39 had the electrical check
done on it again it passed, changes this
time were the water lines were purged and |
|
|
293
|
Tuesday, April 09, 2013, 09:06 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Ta#39 | Electrical check | TM#1 with Ta#39 has not passed it electrical
check again, while sitting at the conditioning
station at air. The readings have not been |
|
|
301
|
Wednesday, April 17, 2013, 09:26 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | Electrical check | Electrical check was performed on TM#3
with no target nothing was wrong was found,
but our megger does not go above 1000 volts |
|
|
338
|
Friday, May 10, 2013, 11:11 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | Electrical check | TM#3 electrical check with no target and
no source tray, see pdf. |
|
|
370
|
Tuesday, May 28, 2013, 10:42 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#40 | Electrical check | Results of the electrical check on
TM#4 with Ta#40, it passed. See attached
PDF for results. |
|
|
384
|
Tuesday, June 25, 2013, 13:20 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#6 | Electrical check | Results from the electrical check of TM#1
with the UC#6 target. See attached PDF. |
|
|
406
|
Tuesday, July 23, 2013, 13:33 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#40 | Electrical check | Results of electrical check on Ta#40 target
on TM#4 post beam at the south hot cell |
|
|
407
|
Wednesday, July 24, 2013, 08:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#29 | Electrical check | Electrical check on TM#4 with SiC#29 has
been done. The reading of the magnet coil
and 60kV common is low at 750 ohms, normally |
|
|
410
|
Thursday, July 25, 2013, 09:37 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | SiC#29 | Electrical check | Electrical check of TM#4 with SiC#29 attached.
Results are pretty much the same as yesterday
for the coil to 60kV common, and anode to |
|
|
429
|
Tuesday, August 27, 2013, 11:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#7 | Electrical check | TM#1 with UCx#7 electrical check, numbers
look good, see PDF for details. |
|
|
452
|
Thursday, September 12, 2013, 10:35 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#29 | Electrical check | TM#4 with SiC#29 post beam electrical check
in the south hot cell see PDF for details. |
|
|
457
|
Thursday, September 19, 2013, 11:09 |
Travis Cave | South Hot-Cell | Maintenance | TM3 | no target | Electrical check | Electrical check of TM#3 with no target
was performed and it failed. |
|
|
461
|
Tuesday, September 24, 2013, 08:15 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | Electrical check | Electrical check was done on TM#3 yesterday
and again the coil lines to the 60kV common
and the coil line to each other failed, as |
|