1112
|
Friday, October 23, 2015, 07:41 |
Dan McDonald | Spent Target Vault | Maintenance | | | F-308's | Six F-308's where received from Nordion
#6,#15,#13,#16 all contained contamination.
Loose contamination was removed with some |
|
|
2546
|
Friday, February 16, 2024, 10:57 |
Adam Newsome | Spent Target Vault | Standard Operation | | | F-308 flask loading - three flasks loaded | Today (2024-02-16), three flasks were loaded
in preparation for shipment with the following
targets: UCx#39, UCx#41 and C#3. |
|
|
2540
|
Friday, February 09, 2024, 12:52 |
Adam Newsome | Spent Target Vault | Standard Operation | | | F-308 flask loading - five flasks loaded | Today (2024-02-09), five flasks were loaded
in preparation for shipment with the following
targets: SiC#41, SiC#42, Nb#9, UC#36, Ta#58. |
|
|
664
|
Tuesday, May 27, 2014, 09:38 |
maicodallavalle | Spent Target Vault | Maintenance | | F-308 Maintenance | F-308 Maintenance | All the F-308's can back from being certified
at Nordion. All of the F-308's have
been serviced and are ready to be filled |
|
|
665
|
Tuesday, May 27, 2014, 09:42 |
maicodallavalle | Spent Target Vault | Maintenance | | | F-308 Maintenance | All of the serviced F-308's have been moved
to the South Hot cell area. |
|
|
685
|
Tuesday, June 24, 2014, 11:33 |
maicodallavalle | Spent Target Vault | Standard Operation | | | F-308 Maintenance | Five F - 308 flasks containing five ISAC
spent targets were moved from the anteroom
into the south hot cell area. When the F |
|
|
804
|
Monday, December 01, 2014, 12:05 |
maicodallavalle | Spent Target Vault | Maintenance | | | F-308 Maintenance | F-308's have been serviced and are ready
to be filled with spent targets. F-308's
witch were serviced are #6,#13,#15,#16,and |
|
|
2324
|
Wednesday, May 25, 2022, 10:23 |
Nadia Jorgenson | Spent Target Vault | Repair | | | F-308 Loading, Mini-Storage Vault Failure | 5 pails were moved from the mini-storage
vault into F-308's
At one point during the loading the |
|
|
200
|
Friday, November 02, 2012, 08:45 |
maicodallavalle | Spent Target Vault | Maintenance | | | F-308 | The F-308 have been cleaned and serviced.
There were three F-308's that came back with
some contamination.#13, #15 and #19 were |
|
|
320
|
Wednesday, April 24, 2013, 10:36 |
maicodallavalle | Spent Target Vault | Maintenance | | | F-308 | The F-308's have been serviced and are
ready to be filled. All inspection records
are stored in docushare. |
|
|
417
|
Wednesday, August 07, 2013, 06:47 |
maicodallavalle | Spent Target Vault | Maintenance | | | F-308 | All the F-308's have been torqued up
and the locks installed. Ready to be moved. |
|
|
1111
|
Wednesday, October 21, 2015, 11:58 |
Anders Mjos | South Hot-Cell | Development | TM2 | ZrC#7 | Extraction Electrode inspection | The failed extraction electrode was inspected
in the hot cell this morning by Anders and
Chad. The following electrical measurements |
|
|
1810
|
Friday, October 26, 2018, 09:44 |
Travis Cave | Conditioning Station | Standard Operation | | | Exit Module moved | The west exit #2 module has been moved from
the south hot cell to the conditioning station. |
|
|
1809
|
Thursday, October 25, 2018, 11:03 |
chad fisher | South Hot-Cell | Repair | | | Exit 2 West | Actuator arms, lemos, lemos and banana
plug block have been disconnected in preparation
for raising of the service tray. Aaron has |
8x |
|
1807
|
Tuesday, October 23, 2018, 10:53 |
chad fisher | South Hot-Cell | Repair | | | Exit 2 East | Cover 1 was removed from the exit module.
Confirmed with David that the actuator rod
that needed to be disconnected was the far |
|
|
1702
|
Thursday, April 19, 2018, 10:27 |
Travis Cave | ITW | Maintenance | | | Entrance module move | The west entrance module has been
moved from the west target station to the
silo. |
|
|
1716
|
Thursday, May 17, 2018, 13:17 |
Travis Cave | ITW | Standard Operation | | | Entrance module move | The west entrance module has been
moved from the silo to the west target station. |
|
|
1766
|
Tuesday, August 07, 2018, 10:44 |
Travis Cave | South Hot-Cell | Maintenance | | | Entrance module move | The west entrance module has been
moved from the west target station to the
south hot cell, for a bellows replacement. |
|
|
1917
|
Wednesday, May 08, 2019, 10:29 |
Travis Cave | South Hot-Cell | Standard Operation | | | Entrance module move | The entrance module has been moved
from the west station to the south hot cell. |
|
|
1919
|
Monday, May 13, 2019, 09:55 |
Travis Cave | ITW | Standard Operation | | | Entrance module move | The West Entrance module has been
moved from the south hot cell to the west
target station. |
|