  581   Monday, January 20, 2014, 13:35 David WangITEStandard OperationTM4 5 shielding blocks had been moved out of ITE

5 SHIELDING BLOCKS HAD BEEN MOVED OUT OF ITE.AIR SAMPLE AND SWIPED FIRST BLOCK AND ITE PIT.NOTHING HAD BEEN FOUND ON ALPHA MONITOR AND OTHER TWO MONITORS.

  582   Monday, January 20, 2014, 13:38 David WangITEStandard OperationTM4 DISCONNECTED TM4 IN ITE.

I DISCONNECTED TM4 IN ITE. ALL WATER LINES HAD BEEN PURGED OUT WITH PRESSURE AIR.

  584   Monday, January 20, 2014, 14:37 Travis CaveITEStandard OperationTM4UC#8module move

TM#4 with UC#8 has been moved from the east target station to the south hot cell.

  585   Tuesday, January 21, 2014, 14:32 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule move

TM#4 has been moved from the south hot cell to the north west silo.

  619   Wednesday, March 12, 2014, 09:45 Travis CaveITWStandard OperationTM4no targetmodule move

TM#4 has been moved from the north west silo to the west target station.

  621   Thursday, March 13, 2014, 07:35 David WangITWStandard OperationTM4 TM4 and ITW turbo pumps have been started

I connected ITW  vacuum system to TM4. TM4 and ITW turbo pumps have been started successfully. The pumping down is good so far.

  625   Wednesday, March 19, 2014, 15:46 David WangITWStandard OperationTM4 TM4 and ITE air to vacuum leak check and TM4 water lines helium test.

With TM4 located in ITW, All air to vacuum seals  on ITW primary and secondary vacuum vessels have been leak  checked with leak detector hooked directly onto the TM4 service cap.The base LR :00xE-9atm.cc/sec. The ITW IG1 was 1.16xE-6 torr which was good. No leak has been found during the checking.Also, the TM4 water lines(except HS) had been  pressurized with 70 psi helium on each for 2 minutes. There was no response during the test. The ITW and TM4 are good on leak checking.See attachment pictures

  629   Monday, March 24, 2014, 12:01 Travis CaveITWStandard OperationTM4no targetmodule move

TM#4 has been moved from the west target station to the south hot cell.

  630   Tuesday, March 25, 2014, 09:11 chad fisherSouth Hot-CellStandard OperationTM4Ta#42Ta#42 install and "new" 9 pin

Ta#42 has been installed onto TM4. The "new" 9 pin connector was not an issue...attually went on better than any other previous one. Leaving the mounting screws loose on the target half allowed use of the manipulator to center the pins and insert them with ease.

  631   Tuesday, March 25, 2014, 13:29 Travis CaveSouth Hot-CellStandard OperationTM4Ta#42Electrical check

TM#4 was checked electrically with and without target on it, see attached PDFs for details.

  632   Wednesday, March 26, 2014, 06:57 David WangSouth Hot-CellStandard OperationTM4Ta#42Leak check on TM4 HS water line with new Ta #42 target.

Chad and I leak checked TM4 HS line with Ta#42 target on the module. The leak detector base LR 0.0xE-9 atm.cc/sec, base pressure0.0xE-4 torr. Chad applied helium to the joints, and flushed the helium around the target. No leak has been found.I will do helium pressure test on this circuit at CS later.

  633   Wednesday, March 26, 2014, 08:36 Travis CaveConditioning StationStandard OperationTM4Ta#42module move

TM#4 with Ta#42 has been moved from the south hot cell to the conditioning station.

  634   Thursday, March 27, 2014, 10:47 Travis CaveConditioning StationStandard OperationTM4Ta#42Electrical check

TM#4 with Ta#42 in the conditioning station under vacuum electrical check.

  635   Monday, March 31, 2014, 13:22 Bevan MossConditioning StationStandard OperationTM4Ta #42HV conditioning

 TM4 with Ta#42 was HV conditioned to 35kV with the optics tray at 17.5kV. There was some vacuum response while ramping but well within normal. Attached is a screen shot and the associated data.

  636   Wednesday, April 02, 2014, 09:14 Travis CaveITWStandard OperationTM4Ta#42module move

TM#4 with Ta#42 has been moved to the west target station.

  666   Tuesday, May 27, 2014, 10:42 Travis CaveITWStandard OperationTM4Ta#42module move

TM#4 with Ta#42 has been moved from  the west target station to the south hot cell.

  667   Tuesday, May 27, 2014, 11:45 Travis CaveSouth Hot-CellStandard OperationTM4Ta#42Electrical check

TM#4 electrical check with Ta#42 attached post beam at the south hot cell.

  668   Wednesday, May 28, 2014, 08:48 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule move

TM#4 with no target has been moved from the south hot cell to the south west silo.

  725   Thursday, August 07, 2014, 10:45 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule move

TM#4 has been moved from the south west silo to the south hot cell.

  726   Thursday, August 07, 2014, 13:58 David WangSouth Hot-CellStandard OperationTM4UCx #10Leak check on TM4 HS water line with new UCX target.

Isaac and I leak checked TM4 HS line with new UCX target. The leak detector base LR 0.0xE-9 atm.cc/sec, base pressure0.0xE-4torr. Isaac sprayed helium  on both VCR connections(5 seconds each) and flushed helium around the target for 6 seconds. No response on leak detector.