  1001   Friday, July 17, 2015, 13:51 chad fisherSouth Hot-CellRepairTM2 TM2 StatusGas lines extensions installed yesterday
were too long and gas lines touched top inside
of containment box. They have been removed
 20150717_134123.jpg 
  1000   Thursday, July 16, 2015, 14:36 chad fisherSouth Hot-CellRepairTM2 TM2 StatusIMG gauge, clip for ground to window lines
and gas line extensions were installed today.
David and I also tried to locate
 20150716_110247.jpg20150716_142818.jpg 
  999   Thursday, July 16, 2015, 07:38 David WangITEStandard Operation  Target Hall Scheduled Activities April 07 - August 07 2015Update the TH schedule according to present
TM2 refurbishment process. See attachments
1,2
 Target_Hall_Scheduled_Activities__Apr_07_to_Aug_07.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_Aug_07.mppTarget_Hall_Scheduled_Activities__Apr_07_to_Aug_19.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_Aug_19.mpp 
  998   Wednesday, July 15, 2015, 11:18 David WangSouth Hot-CellRepairTM2 leak check coil line(R,U) on TM2 at SHCChad and I leak checked the coil 1 circuit(R,U)
after rebuilt coil line is installed on TM2
source tray. The pumping down on the circuit
 007.JPG008.JPG 
  997   Wednesday, July 15, 2015, 11:02 chad fisherSouth Hot-CellRepairTM2 TM2 Coil Line Vacuum Leak CheckTM2 coil line R,U has been vacuum leaked
check at the hot cell and has passed with
no response from the leak detector.
  
  996   Wednesday, July 15, 2015, 09:44 chad fisherSouth Hot-CellRepairTM2 Coil Line replacementwater block jig installed, module side
sealing surfaces re-polished and cleaned.
Coil line inserted into the hot cell and
 TM2_20150715_093157.jpgTM2_20150715_094745.jpg 
  995   Tuesday, July 14, 2015, 12:56 chad fisherSouth Hot-CellRepairTM2 TM2 containment box removedContainment box was removed from Tm2 this
morning  in preparation for installation
of coil line and all the trimmings.
  
  994   Tuesday, July 14, 2015, 08:42 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule movedTM#2, no target, has been moved from the
north east silo to the south hot cell.
  
  993   Monday, July 13, 2015, 11:31 Travis CaveConditioning StationStandard OperationTM1no targetModule movedTM#1 has been moved back to the south west
silo from the conditioning station.
  
  992   Friday, July 10, 2015, 14:41 Anders MjosConditioning StationMaintenanceTM1 Replaced roughing pump The roughing pump was replaced with
a more leak tight pump due to the discovery
of Rn-220 migration while roughing on TM1
  
  991   Friday, July 10, 2015, 09:33 chad fisherSouth Hot-CellRepairTM2 Coil Line DeconCoil line has been in RPG's ultrasonic
decon over night. Initial swipes this morning
picked up 5000 counts. It has been decontaminated
  
  990   Thursday, July 09, 2015, 14:02 David WangConditioning StationDevelopmentTM1 TM1 is pumping down at CSTM1 and CS  vacuum system are connected.
All turbo-pumps are started. The new TP1S
works fine also. The pumping down looks good
  
  989   Thursday, July 09, 2015, 13:51 chad fisherSouth Hot-CellRepairTM2 Coil line removal hot cellcoil line has been removed from the hot
cell. Initial decon was performed...after
it still appears to have approximately 200
  
  988   Thursday, July 09, 2015, 13:17 Anders MjosConditioning StationStandard OperationTM1 TM1 in TCS for alpha contamination test Thursday, July 09, 2015, 13:17: Water
package started.
Thursday, July 09, 2015, 15:20: Water
  
  987   Thursday, July 09, 2015, 09:55 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule movedTM#2 has been moved from the south hot
to the north east silo. TM#1 has been moved
from the south west silo to the conditioning
  
  986   Wednesday, July 08, 2015, 14:48 chad fisherSouth Hot-CellRepairTM2 TM2 StatusWater block jig has been removed. Stuck
source tray side water block jig component
has been removed. An attempt was made to
  
  985   Wednesday, July 08, 2015, 14:24 David WangSouth Hot-CellRepairTM2 TM2 pressure bubble test on RU water blocks.July-06, 2015. Chad , Grant and I did the
bubble test on R,U water blocks. We suspected
the leak on the R,U circuit is from C seals
  
  984   Wednesday, July 08, 2015, 14:05 David WangSouth Hot-CellRepairTM2 leak check coil line(R,U) on TM2 at SHC Chad and I leak checked coil line(R,U)
on TM2 at SHC yesterday. The leak detector
was pumped down to 0.0Xe-9 atm.cc/sec before
  
  983   Wednesday, July 08, 2015, 12:18 chad fisherSouth Hot-CellRepairTM2 R U Coil line RemovalR U coil line removal started at 11:30.
Water block jig installed and coil line disconnected
from module.
 TM2_20150708_coil_line_leak.jpg 
  982   Tuesday, July 07, 2015, 12:12 David WangConditioning StationRepair  CS TP1S replacementCS TP1S had been replaced with a new TP-301
pump this morning.The old pump was broken