  988   Thursday, July 09, 2015, 13:17 Anders MjosConditioning StationStandard OperationTM1 TM1 in TCS for alpha contamination test Thursday, July 09, 2015, 13:17: Water
package started.
Thursday, July 09, 2015, 15:20: Water
  
  987   Thursday, July 09, 2015, 09:55 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule movedTM#2 has been moved from the south hot
to the north east silo. TM#1 has been moved
from the south west silo to the conditioning
  
  986   Wednesday, July 08, 2015, 14:48 chad fisherSouth Hot-CellRepairTM2 TM2 StatusWater block jig has been removed. Stuck
source tray side water block jig component
has been removed. An attempt was made to
  
  985   Wednesday, July 08, 2015, 14:24 David WangSouth Hot-CellRepairTM2 TM2 pressure bubble test on RU water blocks.July-06, 2015. Chad , Grant and I did the
bubble test on R,U water blocks. We suspected
the leak on the R,U circuit is from C seals
  
  984   Wednesday, July 08, 2015, 14:05 David WangSouth Hot-CellRepairTM2 leak check coil line(R,U) on TM2 at SHC Chad and I leak checked coil line(R,U)
on TM2 at SHC yesterday. The leak detector
was pumped down to 0.0Xe-9 atm.cc/sec before
  
  983   Wednesday, July 08, 2015, 12:18 chad fisherSouth Hot-CellRepairTM2 R U Coil line RemovalR U coil line removal started at 11:30.
Water block jig installed and coil line disconnected
from module.
 TM2_20150708_coil_line_leak.jpg 
  982   Tuesday, July 07, 2015, 12:12 David WangConditioning StationRepair  CS TP1S replacementCS TP1S had been replaced with a new TP-301
pump this morning.The old pump was broken
last week.
  
  981   Tuesday, July 07, 2015, 10:50 Anders MjosConditioning StationDevelopment  EPICS migration update - archiver
    The archiver is now merged with
ISAC - data available under Utilities
- Archiver Retrieval
    Old
  
  980   Friday, July 03, 2015, 13:29 chad fisherSouth Hot-CellRepairTM2 Hot Cell/ Module FieldsField measured at block "R" through
tool port with pole monitor is 6.65 mSv/H.
There are three air hoods and two
  
  979   Friday, July 03, 2015, 11:33 chad fisherSouth Hot-CellRepairTM2 TM2 Coil Leak ProgressFirst thing this morning the hot cell was
"cleaned up" in preparation for
the return of TM2 for attempted verification
 TM2_coil_leak_20150703_11.jpg20150703_111248.jpg 
  978   Friday, July 03, 2015, 09:41 David WangConditioning StationStandard OperationTM2 Target Hall Scheduled Activities April 07 - July 24 2015Updated the schedule before the weekend
2015-07-03. See attachment 1,2
Updated the schedule according to
 Target_Hall_Scheduled_Activities__Apr_07_to_July_24_2015.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_July_24_2015.mppTarget_Hall_Scheduled_Activities__Apr_07_to_Aug_07.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_Aug_07.mpp 
  977   Friday, July 03, 2015, 09:27 Anders MjosConditioning StationDevelopment  Controls working on access control in EPICS Some reboots will be done.   
  976   Friday, July 03, 2015, 09:11 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule movedTM#2 has been moved from the conditioning
station to the south hot cell.
  
  975   Thursday, July 02, 2015, 11:51 Travis CaveSpent Target VaultStandard Operation UC#12Spent target movedUC#12 has been moved from the south hot
cell and placed into storage. It is in pail
#125 and in spot 1C of the vault it had a
 Vault_Storage_July_2_2015.pdf 
  974   Thursday, July 02, 2015, 11:49 Travis CaveSouth Hot-CellStandard OperationTM1no targetModule movedTM#1 has been moved from the south hot
cell to the south west silo.
  
  973   Thursday, July 02, 2015, 10:22 Anders MjosConditioning StationMaintenanceTM2 TP1S failed See e-fault 8233. Edi assisted in
diagnosing the problem. The pump will have
to be replaced.
  
  972   Tuesday, June 30, 2015, 15:53 David WangConditioning StationDevelopmentTM2 leak on TM2 at CS I leak checked TM2 at CS this afternoon
which including air to vacuum check on service
cap and helium pressure test on water lines.
 TM2_leak_check_2015-06-30.pdfleak_check_2015-06-30_007.JPGleak_check_2015-06-30_009.JPG 
  971   Tuesday, June 30, 2015, 15:41 David WangITWStandard OperationTM1 TM1 was disconnected in ITW this morning.TM1 was disconnected in ITW  this
morning. The ITW was vented with argon last
night.
  
  970   Tuesday, June 30, 2015, 12:37 chad fisherSouth Hot-CellStandard OperationTM1UCx#12UCx #12 RemovalUCx#12 has been removed from TM1 and placed
in a pail with argon.
Right leg (B) of target is clearly
  
  969   Tuesday, June 30, 2015, 11:27 Travis CaveITWStandard OperationTM1UC#12Module movedTM#1 with UC#12 has been moved from the