Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 947     Entry time: Monday, June 15, 2015, 10:16
Author: chad fisher 
Category: South Hot-Cell 
Type: Repair 
Module: TM2 
Target/Number:  
Subject: C.B. off 

As per scedule TM2 containment box has been removed.

 

Attachment 1: 20150615_101043_1.jpg  950 kB  | Hide | Hide all
20150615_101043_1.jpg
ELOG V2.9.2-2455