Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 937     Entry time: Tuesday, June 09, 2015, 14:36
Author: chad fisher 
Category: Assembly/Bench Test 
Type: Repair 
Module: TM2 
Target/Number:  
Subject: TM2 Source Tray Final Inspection 

Final inspection took place with Pierre, Grant, Friedhelm and Anders present.

Two action items were raised:

1) check routing of 9 pin connector line

2) Check orientation of 9 pin water block

Chad pointed out concerns on clearances between a target and conductor block waterlines, possible optics tray alignment issues (that it had changed slightly from the initial alignment), and gap between steerer housing and ground electrode due to alignment.

Attachment 1: 20150609_132818.jpg  1.292 MB  | Show | Hide all
Attachment 2: 20150609_132825.jpg  1.511 MB  | Hide | Hide all
20150609_132825.jpg
Attachment 3: 20150609_132833.jpg  1.297 MB  | Show | Hide all
Attachment 4: 20150609_132839.jpg  1.500 MB  | Show | Hide all
Attachment 5: 20150609_132851.jpg  1.626 MB  | Show | Hide all
ELOG V2.9.2-2455