Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 934     Entry time: Thursday, June 04, 2015, 08:27
Author: chad fisher 
Category: Assembly/Bench Test 
Type: Repair 
Module: TM2 
Target/Number:  
Subject: TM2 Source Tray C-seal removal and inspection 

Source tray for TM2 has been moved to the alignment area by Dan and co.

This morning Dan removed the c-seals used during the test and he and I inspected the sealing surfaces to determine if they need to be cleaned...they do..trace indium was present on all blocks.

Surfaces will be cleaned before final alignment check.

 

Attachment 1: TM2_20150604_01.jpg  1.893 MB  | Show | Hide all
Attachment 2: TM2_20150604_02.jpg  2.054 MB  | Show | Hide all
Attachment 3: TM2_20150604_03.jpg  1.344 MB  | Hide | Hide all
TM2_20150604_03.jpg
Attachment 4: TM2_20150604_04.jpg  1.410 MB  | Show | Hide all
Attachment 5: TM2_20150604_05.jpg  1.459 MB  | Show | Hide all
ELOG V2.9.2-2455