Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
|
RH-ISAC |
Not logged in |
|
|
Message ID: 932
Entry time: Wednesday, June 03, 2015, 13:51
|
Author: |
David Wang |
Category: |
Conditioning Station |
Type: |
Standard Operation |
Module: |
TM4 |
Target/Number: |
SiC #31 |
Subject: |
TM4 is connected at CS |
|
|
TM4 has been connected at CS. CS HV cover is installed.I made a pair of new cooling lines for TM window cooling at CS. The TM4 containment box window cooling line is connected to the HVC spare circuit now. I checked water flow visually, and it is good. The TM4 is ready for conditioning.See attachment for window cooling modification.
|
|
|
|
|
|