Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 932     Entry time: Wednesday, June 03, 2015, 13:51
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM4 
Target/Number: SiC #31 
Subject: TM4 is connected at CS 

TM4 has been connected at CS. CS HV cover is installed.I made a pair of new cooling lines for TM window cooling at CS. The TM4 containment box window cooling line is connected to the HVC spare circuit now. I checked water flow visually, and it is good. The TM4 is ready for conditioning.See attachment for window cooling modification.

 

Attachment 1: 007.JPG  3.095 MB  | Hide | Hide all
007.JPG
Attachment 2: 009.JPG  2.480 MB  | Show | Hide all
Attachment 3: 008.JPG  4.278 MB  | Show | Hide all
Attachment 4: 010.JPG  2.724 MB  | Show | Hide all
ELOG V2.9.2-2455