Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 876     Entry time: Friday, March 27, 2015, 11:29
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM4 
Target/Number: Ta#45 
Subject: TM4 is connected at CS 

TM4 has been connected at CS which includes high current cables, water lines, EE cable, and Enizel lens cable. The HV cover has been  installed onto the TM4 service cap.The CS water system is started. All water signals are good so far.   Anders will start  HV and heaters conditioning on next Monday.

Attachment 1: 010.JPG  3.995 MB  | Hide | Hide all
010.JPG
Attachment 2: 013.JPG  3.560 MB  | Show | Hide all
Attachment 3: 012.JPG  2.823 MB  | Show | Hide all
ELOG V2.9.2-2455