Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 871     Entry time: Wednesday, March 25, 2015, 10:37
Author: chad fisher 
Category: South Hot-Cell 
Type: Development 
Module:  
Target/Number:  
Subject: TM2 optics tray build 

TM2 optics tray build is continuing. Going well. Hope to have assembly and alignment finished by Friday.

 

 

Attachment 1: 20150325_101718.jpg  963 kB  | Show | Hide all
Attachment 2: 20150325_101735.jpg  824 kB  | Hide | Hide all
20150325_101735.jpg
Attachment 3: 20150325_102024.jpg  1.191 MB  | Show | Hide all
ELOG V2.9.2-2455