Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 807     Entry time: Tuesday, December 02, 2014, 10:15
Author: chad fisher 
Category: South Hot-Cell 
Type: Repair 
Module: TM2 
Target/Number:  
Subject: TM2 Reburb. Loop Install 

Final polish, clean with methanol and clean compressed air.

Loop installed and torqued to 90 in lbs.

Minimum of approximately 1"  between loop and containment box at closest point.

Attachment 1: TM2_20141202_01.jpg  729 kB  | Show | Hide all
Attachment 2: 20141203_142215.jpg  757 kB  Uploaded Thursday, December 11, 2014, 13:11  | Show | Hide all
Attachment 3: 20141203_143530.jpg  685 kB  Uploaded Thursday, December 11, 2014, 13:11  | Hide | Hide all
20141203_143530.jpg
ELOG V2.9.2-2455