Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 799     Entry time: Friday, November 21, 2014, 10:40
Author: Travis Cave 
Category: Spent Target Vault 
Type: Standard Operation 
Module:  
Target/Number: Ta#44 
Subject: Spent target move 

The spent Ta#44 target has been removed from the south hot cell, it was placed in pail #121 and placed in spot 4A of the storage vault. It was 276mSv/hr upon removal from the south hot cell.

Attachment 1: Vault_Storage_November_21_2014.pdf  53 kB  | Hide | Hide all
Vault_Storage_November_21_2014.pdf Vault_Storage_November_21_2014.pdf Vault_Storage_November_21_2014.pdf Vault_Storage_November_21_2014.pdf
ELOG V2.9.2-2455