Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 753     Entry time: Tuesday, September 23, 2014, 13:31
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: UC#10, Ta#44 
Subject: Electrical check 

Electrical checks of TM#4 with UC#10 post beam and Ta#44 before beam see attached PDF for details.

Attachment 1: TM4_UC10_postbeam_shc.PDF  144 kB  | Show | Hide all
Attachment 2: TM4_Ta44_elecchk_shc.PDF  145 kB  | Hide | Hide all
TM4_Ta44_elecchk_shc.PDF
ELOG V2.9.2-2455