Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
|
RH-ISAC |
Not logged in |
|
|
Message ID: 728
Entry time: Friday, August 08, 2014, 08:47
|
Author: |
David Wang |
Category: |
Conditioning Station |
Type: |
Standard Operation |
Module: |
TM4 |
Target/Number: |
UCx #10 |
Subject: |
helium pressure test on TM4 HS water line at CS. |
|
|
Helium pressure test on TM4 HS water line at CS is finished. 80psi helium no leak. |
|
|
|
|
|