Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 6     Entry time: Tuesday, July 19, 2011, 11:52
Author: chad fisher 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: Ta#36 
Subject: New target Ta#36 Installed on TM4 

Ta#36 has been installed on TM4 and is awaiting leak and electrical check.

A small piece of the standard top insulator ITA3376 broke off during removal of Ta#35 (indicated with a blue circle on attached pictures).

"JP's connector, ITA2493 showed the usual and as yet undiagnosed "arc" mark (picture to follow).

The plastic retainers on the new torqtite gaskets showed rad damage.

Attachment 1: DSC_0897.JPG  2.044 MB  | Show | Show all
Attachment 2: DSC_0899.JPG  1.758 MB  | Show | Show all
Attachment 3: DSC_0901.JPG  367 kB  | Show | Show all
Attachment 4: DSC_0905.JPG  4.242 MB  | Show | Show all
ELOG V2.9.2-2455