Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 656     Entry time: Monday, May 05, 2014, 13:11
Author: David Wang 
Category: ITE 
Type: Repair 
Module: TM3 
Target/Number:  
Subject: ITE Entrance module has been disconnected. 

ITE entrance module has been disconnected and the lifting yoke is installed for module move. See attached pictures.

Attachment 1: 011.JPG  3.259 MB  | Show | Hide all
Attachment 2: 025.JPG  2.354 MB  | Show | Hide all
Attachment 3: 033.JPG  3.043 MB  | Show | Hide all
Attachment 4: 035.JPG  3.038 MB  | Hide | Hide all
035.JPG
Attachment 5: 032.JPG  3.025 MB  | Show | Hide all
ELOG V2.9.2-2455