Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 646     Entry time: Friday, April 11, 2014, 11:35
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM3 
Target/Number:  
Subject: Helium pressure test on TM3 HS water line with new Ta target. at CS 

The helium pressure test on TM3 HS water line with new Ta target is finished at CS. The circuit is leak tight.. No any response on LD. See pictures.

Attachment 1: 027.JPG  2.648 MB  | Show | Show all
Attachment 2: 026.JPG  2.167 MB  | Show | Show all
Attachment 3: 025.JPG  2.353 MB  | Show | Show all
Attachment 4: 022.JPG  2.544 MB  | Show | Show all
Attachment 5: 024.JPG  2.892 MB  | Show | Show all
Attachment 6: 023.JPG  3.676 MB  | Show | Show all
ELOG V2.9.2-2455