Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 641     Entry time: Monday, April 07, 2014, 11:49
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM3 
Target/Number: TiC#4 
Subject: Electrical check 

Electrical test of TM#3 with TiC#4 attached. See PDF.

Attachment 1: TM#3_elec_test_TiC#4_surf.PDF  234 kB  | Hide | Hide all
TM#3_elec_test_TiC#4_surf.PDF
ELOG V2.9.2-2455