Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 592     Entry time: Tuesday, February 04, 2014, 09:42
Author: David Wang 
Category: South Hot-Cell 
Type: Repair 
Module: TM2 
Target/Number:  
Subject: pressure test on TM2 tube heater +(D) water line. 

Chad and I did a pressure test on TM2 tube Heater+(D) water line.I pressurized the D line with shop air from quick connectors(both ends) on service cap.chad applied bubble soap onto the D water block in SHC. The test started from 5psi,and increased 5psi each time to 40 psi. From 5 to 35 psi, no bubble has been found on water block. At 40 psi , bubble appeared from blind blank off seal , but not from soldering joints. Since the o-ring seal for the blank off is  vacuum seal , but not for pressurizing, It is understandable the seal could not hold 40 psi pressure air. No bubble had been found on the D water block soldering joints .See attachment pictures.

Attachment 1: 015.JPG  3.346 MB  | Show | Hide all
Attachment 2: 016.JPG  2.560 MB  | Show | Hide all
Attachment 3: 021.JPG  2.950 MB  | Show | Hide all
Attachment 4: 018.JPG  2.410 MB  | Show | Hide all
Attachment 5: 017.JPG  2.956 MB  | Show | Hide all
Attachment 6: 019.JPG  2.528 MB  | Show | Hide all
Attachment 7: 020.JPG  2.533 MB  | Hide | Hide all
020.JPG
Attachment 8: 029.JPG  3.082 MB  | Show | Hide all
Attachment 9: 028.JPG  2.962 MB  | Show | Hide all
Attachment 10: 029.JPG  3.082 MB  | Show | Hide all
ELOG V2.9.2-2455