Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 591     Entry time: Tuesday, February 04, 2014, 08:04
Author: David Wang 
Category: South Hot-Cell 
Type: Repair 
Module: TM2 
Target/Number:  
Subject: Leak check TM2 tube heater (+) water line. 

Chad and I leak checked TM2 tube heater(+) water line yesterday afternoon. The water line was difficult to pump down on base leak rate, but LD  base pressure was fine . The base pressure on leak detector was pumped to 0.0XE-4 torr quickly. The base leak rate only could be pumped  to  4.5 xE-8 atm.cc/sec after 1 hour waiting time. All vacuum connections to leak detector  in the target hall were leak checked and they were good. Chad checked helium flow in SHC. He sprayed helium twice on tube heater(+) water block soldering joints. I did not see any response on leak detector in TH.The base Leak rate and base pressure did not move up during the test.  See attachment pictures.

Attachment 1: IMG_0012.JPG  2.220 MB  | Show | Hide all
Attachment 2: IMG_0013.JPG  2.108 MB  | Hide | Hide all
IMG_0013.JPG
ELOG V2.9.2-2455