Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 394     Entry time: Wednesday, July 03, 2013, 08:44
Author: chad fisher, Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Ta#39 Transfered to spent target storage vault 

Ta#39 has been transferred to spent target storage vault. Ta#39 was placed into pail #106 and placed into spot of 4C of the spent target vault. The pail measured 95.8mSv/hr upon removal from the hot cell. See attached PDF for details.

Attachment 1: Vault_Storage_July_3_2013.pdf  51 kB  Uploaded Wednesday, July 03, 2013, 11:42  | Show | Show all
ELOG V2.9.2-2455