Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 370     Entry time: Tuesday, May 28, 2013, 10:42
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: Ta#40 
Subject: Electrical check 

Results of the electrical check on  TM#4 with Ta#40, it passed. See attached PDF for results.

Attachment 1: TM#4_Ta#40_SIS_Target_Elec_Chk.PDF  233 kB  | Show | Show all
ELOG V2.9.2-2455