Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 334     Entry time: Thursday, May 09, 2013, 10:13
Author: chad fisher 
Category: South Hot-Cell 
Type: Development 
Module:  
Target/Number:  
Subject: Mock-up Progress 

The source tray for the mock-up has been setup for waterline bending and soldering/brazing.

Thanks to Travis for finding the photos for the TM3 rebuild that took place in the anteroom in 09' and Maico and Dan for the support in ironing the issues with the source tray side soldering issues.

 

Attachment 1: IMG_1056[1].JPG  1.168 MB  | Show | Hide all
Attachment 2: IMG_1057[1].JPG  1.146 MB  | Hide | Hide all
IMG_1057[1].JPG
Attachment 3: IMG_1058[1].JPG  1.041 MB  | Show | Hide all
ELOG V2.9.2-2455