Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 332     Entry time: Wednesday, May 08, 2013, 10:12
Author: chad fisher 
Category: South Hot-Cell 
Type: Repair 
Module: TM3 
Target/Number:  
Subject: TM3 9 pin wiring removal 

The 9 pin wiring has successfully been removed from TM3.

Attachment 1: IMG_1055[1].JPG  800 kB  | Show | Show all
ELOG V2.9.2-2455