Message ID: 2822     Entry time: Tuesday, June 24, 2025, 16:08
Author: Adam Newsome 
Category: Pail Handling Tool 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Pail Handling Tool - Inspection 

The pail handling tool which is used to move 5 gallon pails around the target hall was inspected by A. Newsome. The main tool was checked, but not the spare as it is currently in a disassembled and unusable state. The tool appears to be in good, working condition. The following items were checked.

  • Inspect structural integrity of long tube - check for bending, warpage, dents, cracks, rust/corrosion
  • Inspect structural integrity of hook assembly - check for bending, warpage, dents, cracks, rust/corrosion
  • Inspect fasteners - check all fasteners installed as per drawings, fasteners are tight
  • Inspect crane interface assembly - check for damage and wear where the tool connects to the crane
  • Check alignment - verify the tool connects to the crane and hangs vertically with no major misalignment (this step was not done - alignment is regularly checked during operations, and there was no concern as the tube was straight)

Note: these tools are being inspected monthly by D. Wang and F. Song.

Photos can be found in G:\remote handling\Facilities and Projects\ISAC\Pail Handling Tool\Inspections\June 2025

Note: the previous inspection mentioned that the load capacity and lifter tag for the tool were not present. These were installed on both the main and spare tool today.

Attachment 1: PXL_20250624_223603391.MP.jpg  549 kB  | Show | Hide all