Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
2821
Entry time:
Tuesday, June 24, 2025, 15:05
Author:
Frank Song
Category:
ITE
Type:
Standard Operation
Module:
TM4
Target/Number:
C#5 SIS
Subject:
Module Connection
TM4 with new target number C#5 was connected in ITE. see attachment pls.
Attachment 1:
TM4_with_C#5_SIS_connection_in_ITE_2025-06-24.pdf
144 kB
|
Hide
|
Hide all
ELOG V2.9.2-2455