Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2801     Entry time: Tuesday, May 06, 2025, 14:40
Author: Frank Song 
Category: North Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: UC#49 
Subject: electrical check/leak check 

 TM2 with new target UC#49 installed is E/L checked on the flange of NHC in TH. see attachment for detail.

Attachment 1: TM2_with_UC#49_electric_check_on_NHC_2025-05-06.pdf  40 kB  | Show | Show all
ELOG V2.9.2-2455