Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2733     Entry time: Thursday, December 05, 2024, 11:43
Author: Aaron Tam 
Category: South Hot-Cell 
Type: Standard Operation 
Module:  
Target/Number: Ta#68 
Subject: Pail loading - Ta#68 & Others into Pail#300 

December 5, 2024 - Aaron Tam w/ help from Chad, Peter and Adam at the Crane  

Hot Cell Prep:

  • Tools organized, working space cleared, spot for clean tool to sit placed, Air tool is open and spinning clockwise for tightening 

Loading:

  • Ta#68 was loaded into pail# 300
  • PEEK seal parasitic assemblies loaded (PEEK seals were removed in ID: 2724)
  • Farran had some old samples that also went in (More details to come when Farran sends the info)

Lid/latching:

  • This went smoothly

Bail attachment:

  • Some difficulty in attaching the Lifting Bail, but went on smoothly with the help of Chad

Notes:

  • One of the PEEK seal parasitic Target assembly lids was missed in the loading. This will have to be loaded next time. 
  • All parasitic type targets remain in the yellow container shown in photos below. 
Attachment 1: Pail_Landing.jpg  194 kB  | Show | Hide all
Attachment 2: Loaded_Pail.jpg  159 kB  | Show | Hide all
Attachment 3: Parasitic_Lid_that_was_missed.jpg  70 kB  | Show | Hide all
Attachment 4: Location_of_all_parasitic_type_targets_and_fasteners.jpg  152 kB  | Hide | Hide all
Location_of_all_parasitic_type_targets_and_fasteners.jpg
Attachment 5: Parastics_and_Target_stuff_that_went_inside_this_pail.jpg  81 kB  Uploaded Thursday, December 05, 2024, 12:53  | Show | Hide all
ELOG V2.9.2-2455