Entry time: Thursday, December 05, 2024, 11:43
|
Author: |
Aaron Tam |
Category: |
South Hot-Cell |
Type: |
Standard Operation |
Module: |
|
Target/Number: |
Ta#68 |
Subject: |
Pail loading - Ta#68 & Others into Pail#300 |
|
|
December 5, 2024 - Aaron Tam w/ help from Chad, Peter and Adam at the Crane
Hot Cell Prep:
- Tools organized, working space cleared, spot for clean tool to sit placed, Air tool is open and spinning clockwise for tightening
Loading:
- Ta#68 was loaded into pail# 300
- PEEK seal parasitic assemblies loaded (PEEK seals were removed in ID: 2724)
- Farran had some old samples that also went in (More details to come when Farran sends the info)
Lid/latching:
Bail attachment:
- Some difficulty in attaching the Lifting Bail, but went on smoothly with the help of Chad
Notes:
- One of the PEEK seal parasitic Target assembly lids was missed in the loading. This will have to be loaded next time.
- All parasitic type targets remain in the yellow container shown in photos below.
|
|
|
|
|
|
|