Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
|
RH-ISAC |
Not logged in |
|
|
Message ID: 2728
Entry time: Tuesday, December 03, 2024, 15:53
|
Author: |
Aaron Tam |
Category: |
South Hot-Cell |
Type: |
Standard Operation |
Module: |
TM2 |
Target/Number: |
Ta#68 |
Subject: |
Ta#68 Removal |
|
|
Note: Ta#68 had a difficult install. See E-log ID# 2698 for more info
First look:
- Containment box cover looks the same as previous (See:ID: 2697)
- Target shows large amount of soot-like deposits (See photos for locations)
- Deposits seem to have been left on parts of the service tray as well ie.: Multipin connector
Removal:
- Removal was smooth
- Water-line bracket fixing bolts seemed loose even before I put a tool to them
Eyes of sides:
- Better photos of where deposits are
- Everything else seems normal
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|