Message ID: 2617     Entry time: Tuesday, June 18, 2024, 15:04
Author: Adam Newsome 
Category: Spent Target Vault 
Type: Maintenance 
Module:  
Target/Number:  
Subject: Annual Inspection of Main and Mini Storage Vaults  

The annual inspection of the main storage vault will be skipped this year since extensive inspection and testing was performed during the re-alignment job in May (see this e-log for details: e-log 2584). This included successful testing of the emergency close mechanism.

The mini storage vault was informally inspected by Adam Newsome on 2024-06-18. The following was checked:

  • Cabling and cable management
  • Connectors (note: the strain relief for the remote control input cable was loose - it was tightened)
  • Controls box - external connectors and wiring
  • Limit switches - wiring, mounting
  • Motor visual check
  • Drive wheels visual check
  • Drive track visual check (note: the track had small pieces of metal shavings on it which were wiped off)
  • Bearings visual check
  • Miscellaneous fasteners visual check

Photos can be found in G:\remote handling\Facilities and Projects\ISAC\Mini Storage Vault\Inspections

The inspection was generally successful. No areas of concern. Regular inspection will resume next year.