Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2501     Entry time: Friday, November 17, 2023, 11:12
Author: Adam Newsome 
Category: Spent Target Vault 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Four pails moved from main storage to mini storage 

The following four pails were moved from the main storage vault to the mini storage vault, to stage for shipping in Jan. 2024:

1. Pail 260 (SiC#41), Tray 5B
2. Pail 271 (SiC#42), Tray 2B
3. Pail 246 (Nb#10), Tray 6C
4. Pail 265 (UCx#36), Tray 2A

There is current one open slot in the mini storage vault which is planned for the Ta#58 target (formerly in Pail 211, to be repacked in Dec. 2023).

Target Index spreadsheet updated.

See attached printout with mini storage status.

 

Attachment 1: Target_Index_2023-11-17.pdf  94 kB  | Show | Show all
ELOG V2.9.2-2455