Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2494     Entry time: Friday, October 06, 2023, 10:47
Author: Travis Cave 
Category: Spent Target Vault 
Type: Standard Operation 
Module:  
Target/Number: Nb#11 
Subject: Spent Target Move 

 The spent Nb#11 target was removed from the south hot cell and place in the spent target vault. It was placed in pail #283 and place in spot 7B is was 65.7mSv/hr upon removal. see pdf for further vault details.

Attachment 1: Target_Index_2023-10-06.pdf  439 kB  | Hide | Hide all
Target_Index_2023-10-06.pdf
ELOG V2.9.2-2455