Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2477     Entry time: Tuesday, August 15, 2023, 13:58
Author: Frank Song 
Category: ITW 
Type: Standard Operation 
Module: TM2 
Target/Number: Nb#10 
Subject: Module Connection 

 TM2 with new target Nb#10 was moved to ITW from TCS and re-connected in pit. TPs are running at their full speed. 

Attachment 1: TM2_with_Nb#10_connection_in_ITW_2023-08-15.pdf  160 kB  | Hide | Hide all
TM2_with_Nb#10_connection_in_ITW_2023-08-15.pdf TM2_with_Nb#10_connection_in_ITW_2023-08-15.pdf TM2_with_Nb#10_connection_in_ITW_2023-08-15.pdf TM2_with_Nb#10_connection_in_ITW_2023-08-15.pdf
ELOG V2.9.2-2455