Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2448     Entry time: Tuesday, May 30, 2023, 12:23
Author: Frank Song 
Category: ITE 
Type: Standard Operation 
Module: TM4 
Target/Number: TiC#5 
Subject: gas lines pump out in ITE Faraday Cage 

argon is being supplied at 6 psi to TM4. 

Attachment 1: Argon_supplied_at_6psi_to_TM4_in_ITE.JPG  61 kB  | Hide | Hide all
Argon_supplied_at_6psi_to_TM4_in_ITE.JPG
ELOG V2.9.2-2455