Message ID: 2418     Entry time: Wednesday, February 22, 2023, 09:22
Author: Carla Babcock 
Category: ITE/ITW 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: HV testing of ITE/ITW 

Feb. 16 2023: HV tests done on ITE station. Ramped up to 59kV but was not stable there, current draw was very unstable and was sparking every ~6mins. Ramped down to 58kV and it was stable there for 3 hours drawing 285uA.

Feb. 24 2023: HV tests done on ITW station. Ramped easily to 60kV with no sparking - suspicious. Has been stable at 60kV for 45mins with no sparks and current draw of 200uA. Cannot find any reason that things aren't connected properly...

Attachment 1: Screenshot_from_2023-02-16_13-19-44.png  181 kB  | Hide | Hide all
Screenshot_from_2023-02-16_13-19-44.png
Attachment 2: Screenshot_from_2023-02-22_09-20-14.png  16 kB  | Show | Hide all
Attachment 3: Screenshot_from_2023-02-24_17-41-33.png  33 kB  Uploaded Friday, February 24, 2023, 17:43  | Show | Hide all
ELOG V2.9.2-2455