Message ID: 2410     Entry time: Wednesday, January 25, 2023, 06:52
Author: David Wang 
Category: ITE 
Type: Standard Operation 
Module: TM4 
Target/Number: UCx#41 
Subject: ITE primary and secondary vacuum vessel air to vacuum seals leak check.  

ITE primary and secondary vacuum vessel air to vacuum seals leak check was done this week. One leak has been found on IG1S feed through to entrance module surface seal. It explains what we saw on ITE IG1S readings change(from low E-7 torr to 1Xe-6 torr) on December 22, 2022.  This leak seal will be replaced soon.

2023-Jan -27.  O-ring seal 229# was replaced on ITEIG1S feedthrough to entrance module surface sealing. Also o-ring seal 034# was replaced on the blank off cover beside the feed through to entrance module surface sealing. Since these o-rings are too close to each other. It is better to replace both of them to avoid misreading in leak check.

Attachment 1: ITE_vacuum_vessel_leak_check_2023..pdf  52 kB  | Show | Show all